Rahul Sharma (Editor)

Berlin station (Connecticut)

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Tracks
  
1

Opened
  
December 1839

Platforms in use
  
1

Station code
  
BER

Phone
  
+1 800-872-7245

Berlin station (Connecticut)

Location
  
51 Depot RoadBerlin, Connecticut

Connections
  
CT Transit New Britain: 512

Rebuilt
  
1848; 1893; 1896; 1900Spring 2017 (planned)

Address
  
51 Depot Rd, Kensington, CT 06037, USA

Similar
  
Meriden station, Hartford Union Station, Windsor Locks station, Wallingford station, Windsor station

Berlin is a train station located in the Kensington neighborhood of Berlin, Connecticut. It is served by New Haven–Springfield Line and is served by Amtrak's Northeast Regional, New HavenSpringfield Shuttle, and Vermonter routes. High-level platforms connected by an overhead pedestrian bridge will open in 2017.

Contents

On December 21, 2016, the historic 1900-built station building was destroyed by a fire. A temporary platform is in use until the new station is completed.

Early stations and branches

The Hartford and New Haven Railroad (H&NH) opened from New Haven to Meriden in December 1838, and to Hartford in December 1839. The first ticket office was located about 0.5 miles (0.80 km) south of the modern location, possibly in a general store, with a freight house nearby. It was replaced by a wooden station at the modern site in 1848, possibly after the 1839 station burned.

Middletown residents, unhappy at the H&HN skipping their town, constructed the Middletown Railroad to Berlin in 1849; it was taken over by the H&NH in 1850. It connected with the mainline at a wye, with the station inside the wye. The New Britain and Middletown Railroad as built from Berlin to New Britain in 1865; the H&NH operated it from the beginning and purchased it in 1868. In 1870, all three lines connecting at Berlin became part of the New York, New Haven and Hartford Railroad.

Brick stations

The New Haven replaced the 1848 station with a standard yellow brick design, similar to those extant at South Norwalk and Torrington, opening around August 24, 1893 on the east side of the mainline tracks. The two branch lines were extended on a diamond crossing across the mainline around this time. The 1893-built station burned in 1896 and was replaced by a nearly identical building in red brick, which in turn burned on June 27, 1900. The walls and foundation of the later station were largely intact and used to build a new station, which opened in December 1900.

On May 27, 1897, third rail electric service began from Hartford and Berlin to New Britain. Electrification was extended to Bristol in 1898, but withdrawn on July 7, 1906 when the City of New Britain obtained a court order against the electrification, which had caused a number of deaths. However, trolley service powered by overhead wires successfully operated over the Middletown branch from 1906 to the 1920s.

In the 1920s, a southbound station building (possibly a freight house) was constructed on the west side of the tracks. Passenger service ended on the Middletown branch around 1932, and on the branch to New Britain around 1935. The southbound building burned in the 1970s. Amtrak took over intercity service on the mainline on May 1, 1971.

With passenger service at low levels for the last part of the century, the station fell into disrepair. The roof and gutters built into the walls leaked, causing freeze-thaw damage to the brick structure. Many of the original electrical, plumbing, and heating systems were also in ill repair. Despite this, the station was among the best-preserved 19th-century stations in the state, with much of its original interior still intact. The town received $2.12 million in state and federal grants in 2005 to fund restoration. Engineering assessment of the station began in 2008, with final design completed in 2012.

New station

The Hartford Line commuter rail service will begin stopping in early 2018. Two high-level platforms connected by a pedestrian bridge are being installed for the service, with construction starting in 2014. The historic station building, including the ticket office, was closed on March 4, 2016 for renovations. On April 25, 2016, a temporary platform was opened south of the station building so that the northbound high-level platform could be constructed on the site of the former low-level platform.

On December 21, 2016, the 1900-built station building was destroyed by an early-morning fire. The under-construction platforms and bridge were not significantly harmed, but Amtrak briefly stopped service to the station before resuming with a speed restriction. On December 29, state investigators ruled that the station remains were too damaged to repair. Instead, historically significant items like radiators and stone lintels will be salvaged and the station remains demolished. The demolition was delayed due to insurance concerns in January 2017.

The rebuilt Meriden, Berlin, and Wallingford stations are expected to be completed in May 2017, although the stations will serve only existing Amtrak service until January 2018 when Hartford Line service begins.

Connections

Connecticut Transit New Britain: 512

References

Berlin station (Connecticut) Wikipedia


Similar Topics