Samiksha Jaiswal (Editor)

Yate railway station

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Place
  
Yate

Managed by
  
Great Western Railway

2011/12
  
0.295 million

Number of platforms
  
2

Local authority
  
South Gloucestershire

Grid reference
  
ST701826

DfT category
  
F1

2012/13
  
0.307 million

Post-grouping
  
LMS

Station code
  
YAE

Yate railway station

Address
  
Yate, Bristol BS37 5HZ, United Kingdom

Original company
  
Bristol and Gloucester Railway

Similar
  
Filton Abbey Wood rail, Keynsham railway station, Cam and Dursley railway st, Patchway railway station, Lawrence Hill railway station

Yate railway station serves the town of Yate in South Gloucestershire, in south west England. The station is located on the main Bristol to Birmingham line between Bristol Parkway and Cam & Dursley, and is operated by Great Western Railway.

Contents

The station is staffed on weekday mornings. It has two platforms, separated by the A432 road bridge. An automated ticket machine was installed in mid-2007, but stopped functioning due to vandalism and is reported to be "unlikely to be replaced in the foreseeable future". A new ticket machine was installed in 2013.

History

The Yate station first opened on 8 July 1844 and closed in January 1965, along with other wayside stations on the former Bristol and Gloucester Railway; the local stopping service on the route having been withdrawn as a result of the Beeching Axe. This had both its platforms on the southern side of the road bridge mentioned above - the original 1844 goods shed still stands (now in commercial use) next to the old southbound platform site. The station was reopened by British Rail on 11 May 1989 with the backing of Avon County Council.

When first open, trains headed south along the original B&GR/Midland route via Fishponds to reach Bristol, although a connection was subsequently laid in to link this route with the rival Great Western Railway's 1903 "Badminton Line" from Wooton Bassett to Patchway (the current South Wales Main Line) in 1908. The new connection left the older line by means a flying junction at Yate South before heading southwest to join the SWML at the triangular Westerleigh Junction. Though jointly built by the two companies for the purpose of giving the GWR access to the Severn Rail Bridge and Severn and Wye Railway, it also provided an alternative route to Bristol Temple Meads via Filton and the Great Western soon made use of it to compete with the Midland for Bristol to Birmingham traffic, much to the dismay of the latter company. All services now use this newer line to get to Bristol, as the original 1844 route through Mangotsfield was abandoned in January 1970 following the completion of the Bristol area resignalling scheme. A short section of the old route was retained from Yate South Junction after the rest closed, to serve a domestic waste transfer depot & fuel oil distribution terminal at Westerleigh sidings. This line is still in use today.

It is the junction station for the Thornbury Branchline, however the passenger stations on this branch have long since closed (trains ceased in 1944) and the line remained open to serve Tytherington Quarry until September 2013, when it was placed 'Out of Use' by Network Rail following the mothballing of the quarry at the beginning of the year.

In the Strategic Rail Authority’s 2007/08 financial year, Yate was ranked as the 1104th most-used station in the UK.

Services

The station is served Monday to Saturday by a train every hour in both directions between Gloucester and Westbury via Bristol Temple Meads (with two-hourly extensions to/from Worcester & Great Malvern, and to/from Weymouth) southbound, plus a single service to/from Brighton). There have been proposals put forward to run additional services to/from Bristol as part of the second phase of the Greater Bristol Metro plans first put forward in 2008 and rebranded as "MetroWest" in 2013. If implemented the station would become the new northern terminus of the current Weston-super-Mare to Bristol Parkway local service, though this would not happen until after Phase 1 of the scheme is completed in 2019.

Yate station is also served by a two-hourly Sunday service. A normal service operates on most bank holidays.

References

Yate railway station Wikipedia