Waterloo Wind Farm

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
Australia

Owner
  
EnergyAustralia

Commission date
  
2010

Status
  
Operating

Construction began
  
2008

Waterloo Wind Farm

Location
  
Waterloo, South Australia

Address
  
21 Milde Rd, Waterloo SA 5413, Australia

Close up of a turning windmill at waterloo wind farm sou


Waterloo wind farm is based east of Mintaro, South Australia. It is the largest wind farm operated by EnergyAustralia.

Contents

Waterloo wind farm time lapse sequence


Site

The site is positioned on a rocky ridge on privately owned property at Waterloo. The 111 megawatt wind farm spreads across five acres of land and cost about $350 million, it began construction in November, 2008 and has been operational since October 2010.

For about two months in 2013, the site was monitored by the Environmental Protection Authority. The wind farm’s infrasound and low-frequency noise were both examined. Acoustics firm Resonate conducted noise and meteorological monitoring in the area.

Turbines

Waterloo wind farm has 37 Vestas V90-3MW turbines, each 80 metres high, with each turbine blade 44 metres long and weighing about 8 tonnes. The tower sections weigh approximately 90 tonnes in total with the tower and blades combined weighing 125 tonnes. On average the blades turn at 16.2 rpm. There are four levels in a turbine and it takes about five minutes to get to the top.

Each wind turbine produces on average 24 megawatt hours of power each day. On a windy day three wind turbines can power the whole of Clare and the whole wind farm can power up to 163,000 homes or 5 to 10% of South Australia.

The wind farm is planned to be upgraded with six new turbines.