Water supply and sanitation in Bangladesh is characterised by a number of achievements and challenges. The share of the population with access to an improved water source was estimated at 98% in 2004, a very high level for a low-income country. This has been achieved to a large extent through the construction of handpumps with the support of external donors. However, in 1993 it was discovered that groundwater, the source of drinking water for 97% of the rural population and a significant share of the urban population, is in many cases naturally contaminated with arsenic. It gradually emerged that 70 million people drank water which exceeds the WHO guidelines of 10 microgram of arsenic per litre, and 30 million drank water containing more than the Bangladesh National Standard of 50 microgram per litre, leading to chronic arsenic poisoning. On the other hand, surface water is usually polluted and requires treatment. Taking arsenic contamination into account, it was estimated that in 2004 still 74% of the population had access to arsenic-free drinking water. Another challenge is the low level of cost recovery due to low tariffs and poor economic efficiency, especially in urban areas where revenues from water sales do not even cover operating costs. In rural areas, users contribute 34% of investment costs, and at least in piped water schemes supported by the Rural Development Academy recover operating costs.

Sanitation faces its own set of challenges, with only 56% of the population estimated to have had access to adequate sanitation facilities in 2010. A new approach to improve sanitation coverage in rural areas, the community-led total sanitation concept that has been first introduced in Bangladesh, is credited for having contributed significantly to the increase in sanitation coverage since 2000.

The government has adopted a number of policies to remedy the challenges in the sector, including National Policies for Safe Water Supply and Sanitation, both of 1998, a National Water Policy of 1999, a National Water Management Plan, and a National Policy for Arsenic Mitigation, both of 2004, as well as a National Sanitation Strategy of 2005. Among others, these policies emphasise decentralisation, user participation, the role of women, and "appropriate pricing rules". The Arsenic Mitigation Policy gives "preference to surface water over groundwater". At the operational level, there has also been a conceptual shift from single-use of water – such as through handpumps for drinking water and motorised deep tubewells for irrigation – to multiple use of water from deep tubewells since the 1990s.

Access

Since arsenic was discovered in Bangladeshi groundwater in 1993, the share of population with access to safe drinking water had to be adjusted downward. According to the Joint Monitoring Program (JMP) for Water Supply and Sanitation of UNICEF and the World Health Organization (WHO), access to an improved source of water supply increased only slightly from 77% in 1990 to 81% in 2010, whereas coverage of improved sanitation increased from 39% to 46% during the same period.

Estimates of access to an improved source of water supply is greatly affected by the presence of arsenic in groundwater, which is estimated to affect 27% of all wells and is subtracted from the figures obtained by solely measuring the level of access to infrastructure. Without taking into account the presence of arsenic, 99% of the urban population and 97% of the rural population actually had access to an improved source of water supply according to the Demographic and Health Survey of 2004, which is an unusually high level of access for a low-income country. In urban areas, access is broken down as follows:

  • 23% piped inside dwelling
  • 8% piped outside dwelling
  • 68% tubewells
  • In rural areas the breakdown is:

  • Less than 0.6% piped inside and outside dwelling
  • 96% tubewells
  • 1% dug wells
  • More than 2% ponds, lakes and rivers
  • Rainwater harvesting, although practised in Bangladesh, was not included in the survey. The official figures of the Joint Monitoring Program, taking into account the presence of arsenic, are as follows:

    In 2005, the Bangladeshi Minister for Local Government and Rural Development presented a National Sanitation Strategy that ambitiously aimed to reach universal access to sanitation by 2010. Without mentioning community-led total sanitation by name (see under innovative approaches below), the strategy incorporates important elements of this approach, such as an emphasis on participation by the whole community and the principle of not subsidising hardware except for the "hardcore poor".

    Continuity of supply

    Among 11 cities participating in performance benchmarking in 2006–07, none provided water continuously to all customers. According to the benchmarking data, the city with the shortest supply per day was Bagerhat with 2 hours and the city with the longest supply was Dhaka with 23 hours, followed by Manikganj and Chandpur with 20 hours. Within cities, the duration of supply often varies, as it does between seasons. Major water shortages in Bangladesh occur during the dry season. As of 2011, however, intermittent supply was common in at least parts of Dhaka, forcing families to purchase drinking water and use pond or river water for their other needs. Regular power cuts, which turn off well pumps, also contribute to the intermittency of supply.

    Wastewater treatment

    In Dhaka, nearly one third of domestic effluents does not receive any kind of treatment. About 30% of the served population of the Dhaka Water Supply and Sewerage Authority (DWASA) is covered by a sewerage system, the only one in the entire country. There is one sewage treatment plant with a capacity of 120,000 m³ per day. About 30% of the population uses conventional septic tanks and another 15% uses bucket and pit latrines. During the rainy season, sewage overflows are common.

    Water use

    Only about 15 km³ annually, or about 1% of total water resources, is being withdrawn for human use. Out of the total withdrawals, 86% is for agriculture, 12% for domestic water supply and 2% for industry. It is predicted that Bangladesh's population will increase from 129 million people in 2000 to 181 million by 2025 and 224 million by 2050, accompanied by an increased demand for water.

    Piped water supply, as estimated by the utility, was about 100 litres per capita per day in Dhaka in 2007 for those with access to piped water supply. This amount is slightly less than per capita water use in Germany. Given the low share of metering, estimates of per capita water use are not reliable. In a sample of 11 cities, 8 did not have any customer metering at all. In Dhaka and Chittagong, 70 and 86 percent of customers were metered. In the city of Rajshahi, which has no metering, the municipal utility estimated per capita water use at 98 litres per capita per day. However, a customer satisfaction survey carried out together with the NGO Forum on Drinking Water Supply and Sanitation carried out among 600 respondents in 2008 found that the average was only 78 litres. Water use varied significantly depending on income, with the poor consuming 43 litres and the poorest only 28 litres. The survey also showed that half the respondents drank water straight from the tap without filtering or boiling it, while 27% rated the water quality as poor. The estimated amount of water consumed varies significantly between cities. For example, in 2006–07 it was estimated at more than 250 litres in Manikganj, but at only 33 litres in Chapai Nawabganj and Gazipur. The average for 11 cities was 88 litres.

    History and recent developments

    Remark: This section needs to be rewritten to change the focus from water resources management to water supply and sanitation, and by including more appropriate sub-headings.

    The country's national water policy was mainly focused on agricultural issues and was aimed at food self-sufficiency. Accordingly, flood control drainage and irrigation projects were the most common measures. In the 1990s the necessity of a more comprehensive approach was recognised, leading to the formulation of a National Water Policy.

    History

    The first central institution in the water sector in what is now Bangladesh was the East Pakistan Water and Power Development Agency (EPWAPDA), created in 1959 to plan, construct and operate all water development schemes. In 1964, EPWAPDA, with the assistance of the United States development agency USAID, prepared a 20-year Water Master Plan, including flood control. Although infrastructure was constructed, the lack of operation and maintenance, among other things, soon led to its deterioration.

    After the independence from Pakistan in 1971, EPWAPDA was restructured and renamed the Bangladesh Water Development Board. The new republic soon gained support from several agencies. The World Bank published the Land and Water Sector Study in 1972, advocating small-scale flood control and irrigation projects. As a result, small-scale irrigation spread quickly during the 1970s and 1980s, partly financed by the private sector.

    In light of the growing population and the expanding agricultural and industrial sectors, in 1983 the National Water Resources Council (NWRC) was founded and the newly created Master Plan Organization (MPO) started to draw up a comprehensive National Water Plan (NWP). The first phase of the NWP was completed in 1986 and included an assessment of available water resources and future demand. According to the Asian Development Bank (ADB), a lack of attention to intersectoral and environmental issues led the national government to reject the plan. Consequently, the second phase of the NWP was drawn up from 1987 to 1991, including an estimate of the available groundwater and surface water as well as a draft water law. The draft also took into account environmental needs. In 1991, the MPO was restructured and renamed the Water Resources Planning Organization (WARPO).

    Two destructive floods in 1987 and 1988 were followed by increased international attention and assistance. In 1989, several studies were prepared by the United Nations Development Fund (UNDO) and national agencies from France, the United States, Japan, and others. The World Bank coordinated the donor activities. At the end of the year, the Flood Action Plan (FAP) was approved by the national government of Bangladesh. However, according to Chadwick the plan was criticised by some donors and civil society. The planned participation of civil society was hampered by the military dictatorship that governed the country at that time. Later, the national government approved the FAP's final report, called the Bangladesh Water and Flood Management Strategy (BWFMS), in 1995 with the support of donor agencies. Among other things, the strategy proposed the formulation of a comprehensive national water management plan, increased user participation and environmental impact assessment as integral parts of planning. Consequently, the Flood Planning Coordination Organization (FPCO), which had been established in 1992 to co-ordinate the studies, was merged with WARPO in 1996.

    In 1999, on the recommendation of the World Bank and after extensive consultation with all relevant actors, including NGOs and the civil society, the National Water Policy (NWP) was adopted. The document explicitly states 6 main objectives:

    1. To address the use and development of groundwater and surface water in an efficient and equitable way
    2. To ensure the availability of water to all parts of the society
    3. To accelerate the development of public and private water systems through legal and financial measures and incentives, including appropriate water rights and water pricing rules
    4. To formulate institutional changes, encouraging decentralisation and enhancing the role of women in water management
    5. To provide a legal and regulatory framework which encourages decentralisation, consideration of environmental impacts, and private sector investment
    6. To develop knowledge and capability to facilitate improved future water resources management plans to encourage, among other things, broad user participation

    Furthermore, WARPO has developed a National Water Management Plan (NWMP), which was approved by NWRC in 2004 and aims at implementing the NWP within 25 years. It is expected to be reviewed and updated every five years. In 2005, the national government included the improvement of water supply and sanitation as part of its agenda for reducing poverty.

    Complementing the National Water Policy, the government adopted the National Policy for Safe Water Supply and Sanitation in 1998. In 2004 it also adopted a National Policy for Arsenic Mitigation in 2004. The policy emphasises public awareness, alternative safe water supply, proper diagnosis and management of patients, and capacity building. In terms of alternative supplies it gives "preference to surface water over groundwater". The latter aspect is controversial, since surface water is often highly contaminated with pathogens while deeper groundwater is often safe and free of arsenic.

    Innovative approaches

    A number of innovative approaches to improve access to and the sustainability of water supply and sanitation were developed in Bangladesh since the turn of the millennium. These include community-led total sanitation and new management models for piped rural water supply, both further described below.

    In addition, innovative pilot projects were initiated in Dhaka. The first provided water to hitherto unserved slum areas through community-based organisations with the assistance of the NGO Dushtha Shasthya Kendra (DSK) and WaterAid from the UK. The second is a pilot for a small-bore sewer system in the Mirpur area of Dhaka with financing from the Asian Development Bank. A third project involved contracting out billing and collection to a woker's cooperative as an alternative to private sector participation.

    Community-led total sanitation

    In 2000 a new approach to increasing sanitation coverage, called community-led total sanitation (CLTS), was first introduced in Bangladesh in a small village in the Rajshahi District by Dr. Kamal Kar in co-operation with WaterAid Bangladesh and the Village Education Resource Centre (VERC).

    Until then, most traditional sanitation programs relied on the provision of subsidies for the construction of latrines and hygiene education. Under this framework, the subsidised facilities were expensive and often did not reach all members of a community. In addition, the subsidies may have reduced the feeling of personal responsibility for the toilets.

    These perceived shortcomings led to the development of the CLTS approach in Bangladesh, shifting the focus on personal responsibility and low-cost solutions. CLTS aims to totally stop open defecation within a community rather than facilitating improved sanitation only to selected households. Awareness of local sanitation issues is raised through a walk to open defecation areas and water points (walk of shame) and a calculation of the amount of excreta caused by open defecation. Combined with hygiene education, the approach aims to make the entire community realise the severe health impacts of open defecation. Since individual carelessness may affect the entire community, pressure on each person becomes stronger to follow sanitation principles such as using sanitary toilets, washing hands, and practising good hygiene. To introduce sanitation even in the poorest households, low-cost toilets are promoted, constructed with local materials. The purchase of the facility is not subsidised, so that every household must finance its own toilets.

    In 2006, the number of villages with total sanitation was estimated at more than 5,000 throughout the country. At the same time, CLTS had spread in at least six countries in Asia and three in Africa. In 2009, the UN Special Rapporteur for the human right to water and sanitation noted that "the experience of Bangladesh (with CLTS) has positively influenced countries in other regions of the world and has instilled confidence in the belief that low-cost sanitation is possible. It has also had a powerful effect in breaking the taboo that often surrounds the issue of sanitation. The independent expert observed that most people with whom she met, including the Prime Minister, were pleased, and even proud, to discuss sanitation and the achievements of Bangladesh in this domain." However, she also noted "concerns (...) about a lack of monitoring of continued latrine usage, maintenance of latrines and overreporting of sanitation coverage".

    New management models for piped rural water supply

    Deep tubewells with electric pumps are common as source of water supply for irrigation in Bangladesh. The government had long been interested in making the operation of these tubewells more financially viable. One option considered was to increase revenues by selling water from deep tubewells as drinking water and for small-scale commercial operations, thus at the same time addressing the arsenic crisis. Also, the government was interested in developing new management models beyond pure community management to both mobilise funding and improve the quality and sustainability of service provision. To that effect two parallel innovative approaches have been pursued.

    Rural Development Academy multipurpose schemes. These efforts to combine piped drinking water and irrigation schemes were initiated in 1999 by the Rural Development Academy (RDA) with government funds and no donor involvement. RDA invited sponsors and offered to finance the construction of the well and the water supply system under the condition that:

  • the sponsors from the community would create a water user association (samitee),
  • pay for 10% of the investment costs at the time of completion of the construction,
  • operate and maintain the system for 10 years, and
  • pay back the remaining 90% of the investment costs over this period.
  • As of January 2008, 73 small schemes had been completed, both in areas where the shallow aquifer is contaminated by arsenic and those where this is not the case. Sponsors are NGOs, cooperatives or individuals. The number of applicants each year outnumbers the schemes to be constructed. However, tariffs have been set at relatively low levels, so that the operators barely break even and have not paid back the loans for 90% of the investment costs. Revenues from irrigation typically account for a third of the revenues of the water schemes, the remainder coming from the sale of drinking water.

    Bangladesh Water Supply Program Project. Another approach has been supported by the World Bank through the Bangladesh Water Supply Program Project (BWSPP), implemented by the Department of Public Health and Engineering (DPHE). This approach, initiated in 2001, has been inspired by the RDA experience, but with two crucial modifications: First, it required sponsors to come up with the entire financing up-front, which was supposed to be recovered through revenues from the sale of water. Second, only drinking water was to be provided and no irrigation water. Finding sponsors willing to put their own capital at risk proved to be difficult. For this reason, and due to project management difficulties, only two schemes had been built as of January 2008, providing water to 2,000 households. Neither scheme has become financially viable. An NGO built and operates the schemes, since no private company was interested in doing so.

    Responsibility for water supply and sanitation

    According to a 2009 report by the UN Special Rapporteur on the human right to water and sanitation after a visit to Bangladesh, there is "an overall lack of monitoring and accountability" and "corruption continues to plague the sector". She also notes that standardised reporting processes and performance indicators to monitor utility performance were missing and that "there is no independent and effective regulation of the water supply and sanitation sector", making it next to impossible to ensure compliance with the numerous laws and policies in place. According to the UN report, the activities of the different ministries, the departments within the Ministry of Local Government, Rural Development and water supply and sewerage authorities need to be better coordinated.

    Policy and regulation

    Numerous ministries in Bangladesh have responsibilities relating to water and sanitation services. The Ministry of Local Government, Rural Development and Cooperatives has overall responsibility for monitoring and governing the sector, including policy formulation through its Local Government Division. Within the Division, the Department of Public Health Engineering (DPHE) assists municipalities and communities in building water supply infrastructure in all parts of the country, except for the three largest urban areas, Dhaka, Khulna and Chittagong. Other ministries with competencies in the areas of water and sanitation include those of education, health and family welfare; water resources; environment and forests; finance; and the Planning Commission. The National Water Management Plan (NWMP) lists not less than 13 ministries involved in the sector.

    Concerning water resources management, the National Water Resources Council (NWRC) chaired by the Prime Minister formulates policies and oversees their implementation. The Water Resources Planning Organization (WARPO) under the Ministry of Water Resources acts as Secretariat of the Executive Committee.

    Water Supply and Sewerage Authorities

    Water supply and sanitation in the three largest cities is carried out by semi-autonomous municipal utilities. In the cities of Dhaka, Chittagong and Khulna, the semi-autonomous Dhaka Water Supply and Sewerage Authority (DWASA), the Chittagong Water Supply and Sewerage Authority (CWASA) and the Khulna Water Supply and Sewerage Authority (KWASA) provide water for domestic, industrial, and commercial consumption as well as sewerage and stormwater drainage. KWASA was only established in 2008, while the two other utilities are older.

    Municipalities

    Bangladesh is subdivided into more than 200 municipalities (Paurashavas). Outside of Dhaka, Chittagong and Khulna, each municipality is directly responsible for its own water supply, sewerage, and storm drainage. They are empowered to charge tariffs and receive assistance from the Department of Public Health Engineering (DPHE), which is responsible for waterworks development projects as well as planning in the rural water sector and all urban areas except for the three largest cities. Once the projects are completed, the facilities are handed over to the municipalities.

    Private sector and NGOs

    In addition to government institutions, non-governmental organisations (NGOs) and the private sector are involved in the provision of services and are acknowledged within the institutional sector framework in the NWMP. The improvement of the investment climate for the private sector is included in the six main objectives of the document. However, private sector participation in the Bangladeshi water supply and sanitation sector remains limited to small businesses. According to Das Gupta, direct private investment is almost non-existent. The NWMP recognises that large-scale private participation remains a challenge.

    Other functions

    The Joint Rivers Commission (JRC) under the Ministry of Water Resources has the main function of working on transboundary water issues together with the other riparian countries. Environmental standards are set and enforced by the Department of Environment. The Bangladesh Water Development Board (BWDB) is responsible for the implementation of water projects that exceed 10 km² in size, whereas the Local Government Engineering Department (LGED) is entrusted with smaller projects. The Rajdhani Unnayan Kartipakkha, Bangladesh's capital development authority, is in charge of urban development and setting building codes in Dhaka.

    Efficiency of utilities

    There is little reliable quantitative information available concerning the performance of Bangladeshi water and sewer utilities, including on their efficiency. Beginning in 2005, the first systematic performance benchmarking for water and sewer utilities in Bangladesh was initiated by the World Bank's Water and sanitation program as part of a regional project that also covered India and Pakistan, covering 11 utilities in Bangladesh. The benchmarking project found that data were not very reliable, that benchmarking was "largely externally driven than internally motivated" and that the organizational culture of utilities was "often slow to accept performance measurement, accountability to customers and to government, and improved service outcomes." Two common indicators of the efficiency of utilities are non-revenue water and labour productivity. According to these indicators, the efficiency of Bangladeshi utilities is poor, despite some recent improvements.

    In Dhaka, the share of non-revenue water (NRW) has been substantially reduced from 54% in 2003 to 29% in 2010. Concerning municipalities, the ADB estimates NRW at 33–40%. Labor productity was low, with staffing levels averaging 9 per 1,000 connections and ranging from 7–15 compared to a good practice of less than 5. In 2006–07 the ratio was more than 12 staff per 1,000 connections for Dhaka and 15 in Chittagong.

    Tariffs and cost recovery

    The National Water Master Plan provides for the gradual increase of tariffs to fully recover the costs of service provision in urban areas using an increasing block tariff structure. In rural areas, the tariffs should cover at least all operation and maintenance costs. Since this framework is not yet implemented, municipalities or water utilities have the right to set their own tariffs controlled by the government.

    Dhaka The average tariff in Dhaka was US$0.08 per m³ in 2007. Those connected to sewerage had to pay double. Connection fees were between US$29 and US$60, according to the diameter of the pipe. Despite the extremely low tariff, the utility recovered more than its operating cost.

    Other urban areas Cost recovery varies between cities. In a sample of 11 utilities, the operating ratio averaged 0.89. In principle, this indicates that on average operating costs were covered, but because of unreliable data it is not sure if this is actually true. The water tariff was on average 4.38 Takas per cubic meter (USD 0.06), the lowest one being 2.11 Takas (0.03) in Rajshahi, the highest one being 6.89 Takas (USD 0.09) in Chittagong.

    Rural areas. Tariffs in rural areas vary. In piped multi-purpose schemes supported by RDA households pay a flat fee equivalent to about US$1.20 per month for drinking water and a flat fee equivalent to US$72/season/hectare for irrigation. Revenues from these tariffs allow to recover operation and maintenance costs.

    Investment and financing

    Investment. Water and sanitation are not the subject of a separate budget line, but spread over the budgets of different institutions, which makes it difficult to assess how much government funding is spent on water and sanitation, and for what purposes. In the Annual Development Programme (ADP) of the Bangladeshi Planning Commission, the government's development investment in water supply and sanitation ranged between US$50 million and US$101 million from fiscal years 1994–1995 to 2000–2001.

    From 1994–1995 to 2000–2001, the water resources subsector, including flood control and irrigation received much more funding than the water supply and sanitation sector, which is shown above. On average, US$74 million or US$0.55 per capita have been spent per year. In 1996–1997, the investment for water resources was more than almost four times as high as the amount provided for water supply and sanitation. From 1973 to 1990, the share of development expenditures for water supply and sanitation decreased gradually in the respective five-year plans. In the first one, it was 2.48% of development investment, dropping to 2.14% and 1.25% in the second and third five-year plans, respectively. In the fourth plan, the allocation increased slightly to 1.41% of the budget.

    According to an ADB document comparing water supply in major Asian cities, DWASA's capital expenditure was US$26 million or US$3.51 per user in 2001.

    Rural areas According to an evaluation by the Danish Ministry of Foreign Affairs, 30% of the rural water supply and sanitation in Bangladesh is financed by the national government, whereas 34% comes from bilateral and multilateral donors and another 4% from international and local NGOS. The users contribute the remaining 32%, a remarkable share compared to other countries evaluated in the study, such as Ghana, Egypt or Benin.

    Financing. Many cities rely on development grants by the central government. In small urban water supply systems, property taxes are used to mobilise local resources. Funding can also be obtained from the Municipal Development Fund. External funding is also common (see section on external donors).