Neha Patil (Editor)

Washington Street Tunnel (Chicago)

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Status
  
Closed and covered

Highest elevation
  
594 ft (181.05 m)

Owner
  
Chicago

Number of lanes
  
3

Closed
  
1954

No. of lanes
  
3

Opened
  
1867

Start
  
North Franklin Street

End
  
Clinton St

Washington Street Tunnel (Chicago)

Operator
  
West Chicago Street RR. Chicago Union Transit Chicago Surface Lines Chicago Transit Authority

Length
  
1,605 ft (489.20 m) (as built)

Lowest elevation
  
534 ft (162.76 m) (after lowering)

The Washington Street Tunnel was the first traffic tunnel under the Chicago River. J.L. Lake was awarded the contract to construct the tunnel in July 1867 and its construction was completed January 1, 1869. This tunnel was 1605 feet long, from Franklin Street west to Clinton Street, and cost $517,000.

Contents

As built

Originally built of masonry with one lane for pedestrians and 2 lanes for horse-drawn traffic, by 1884 it was leaking and had been closed. In 1888 the West Chicago Street Railroad leased the tunnel. If they repaired it and built a vehicle bridge they could use the tunnel exclusively for cable car service. Construction began in 1888 and the tunnel was reopened August 12, 1890

The reversing of the Chicago River in 1900 lowered the water level and exposed the roof of the tunnel in the riverbed. Several ships ran aground on it, damaging the roof. In 1904 the Federal government declared it a hazard to navigation, it was closed on August 19, 1906.

Reconstruction

A wider, deeper concrete replacement was built under the original masonry. The approaches were deepened to a new lower tunnel level. The grades were aligned for the cars to enter from a shallow subway just below street level. The subway was not built, concrete ramps raised the tracks up to street grade. George W. Jackson was the contractor for rebuilding the tunnel.

After lowering

The tunnel reopened for electric streetcar service on January 29, 1911 and was in use until the end of streetcar service 1953. By 2013 both approaches had been covered.

Plans for subways

Plans were made to incorporate the tunnel into a high-level subway to run under Washington Street between Clinton Street and Grand Park. The plans were expanded after the Second World War to add an additional high-level subway running parallel to the Washington Street line under Jackson Street, similarly using the tunnel located between Jackson and Van Buren Streets. Both would be tied into another subway tunnel to be dug under Clinton Street, proposed in the interim. The only construction accomplished in advance of these plans were the pair of portals in the Eisenhower Expressway median, 200 feet east of Halsted Street, constructed in 1952 simultaneously with the pair of portals for the Blue Line, and the double-wide station built at Peoria Street in 1964 to accommodate the anticipated platform north of the UIC-Halsted platform for the Blue Line. In 1951-1952, the plans were modified to use the Washington Street subway as a busway rather than as a train tunnel, while Clinton and Jackson tunnels were merged and remained a rail plan. The plan was cancelled in April 1962, although the design and placement of the Peoria Street station house went unchanged.

References

Washington Street Tunnel (Chicago) Wikipedia