Suvarna Garge (Editor)

Warrior Run Generating Station

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
United States

Nameplate capacity
  
205 MWe

Owner
  
AES Corporation

Commission date
  
2000

Status
  
Operational

Phone
  
+1 301-777-0055

Primary fuel
  
Bituminous coal

Cogeneration?
  
Y

Warrior Run Generating Station

Location
  
Allegany County, near Cumberland, Maryland

Address
  
11600 Mexico Farms Rd SE, Cumberland, MD 21502, USA

Similar
  
City of Cumberla, ABC Supply Co - Inc, Cumberla Station, Allegany College of Maryland, Allegany Scrap

Warrior Run Generating Station, owned by the AES Corporation, is a 205 megawatt cogeneration plant located south of Cumberland, Maryland, at 11600 Mexico Farms Road. In addition to electric power, the plant also produces food-grade carbon dioxide.

Contents

Design and operation

The plant uses fluidized bed combustion (FBC) technology, in which bituminous coal and finely ground limestone are injected, using air, into the boiler. Air keeps the limestone and coal suspended in a fluid-like condition. The limestone reacts with sulfur dioxide, released during combustion of the coal, removing this pollutant from the plant's emissions. With the enhanced sulfur dioxide removal due to the FBC technology, Warrior Run can burn approximately 400,000 short tons (360,000 tonnes) of coal from Maryland each year, which tends to be of a higher sulfur content. During 2007, 100 percent of the coal burned at Warrior Run was mined in Maryland.

The FBC boiler operates at a lower temperature compared to other coal-fired boiler technology, reducing production of nitrogen oxides. Injection of ammonia and a selective non-catalytic reduction system are also used to remove nitrogen oxides. A baghouse removes particulates from the plant's air emissions.

Water used by the plant is supplied by the City of Cumberland water system. Fly and bottom ash from Warrior Run, which is highly alkaline due to the limestone used by the FBC boiler, is used as fill at four nearby surface coal mines. The plant produces about 370,000 short tons (340,000 t) of ash each year.

Warrior Run surcharge

Warrior Run became operational on February 10, 2000. As provided by the Public Utility Regulatory Policies Act of 1978, the local utility, the Potomac Edision Company, which is a unit of FirstEnergy, is required to purchase the electric output of Warrior Run at its "avoided cost" rate under a contract for thirty years. However, this "avoided cost" rate, which was determined at the time of the contract, is higher than the current wholesale price of electricity, so Potomac Edison recovers the difference in this price through a surcharge on the bills of its customers. This surcharge will end in April 2030. In 2007 the Maryland Public Service Commission approved a plan permitting the Warrior Run electric output to be sold into the PJM Interconnection day-ahead wholesale market and the capacity bid into the PJM forward capacity market, with the proceeds used to reduce the surcharge.

References

Warrior Run Generating Station Wikipedia