Rahul Sharma (Editor)

Vevey–Chardonne–Mont Pèlerin funicular railway

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Type
  
Highest elevation
  
807 m (2,648 ft)

Line length
  
1,584 m (5,197 ft)

Maximum incline
  
54%

Vevey–Chardonne–Mont Pèlerin funicular railway Le funiculaire VeveyChardonneMontPlerin dans sa nouvelle livre

Number of tracks
  
Single track with passing loop

Track gauge
  
1,000 mm (3 ft 3 ⁄8 in)

Vevey chardonne mont pe lerin funicular railway


The Vevey–Chardonne–Mont Pèlerin funicular railway (French: Chemin de fer funiculaire Vevey–Chardonne–Mont Pèlerin; VCP) is a funicular which runs between Vevey, a town on the north shore of Lake Geneva in the canton of Vaud, through the Chardonne vineyards of Lavaux to the Mont Pèlerin.

Contents

Vevey–Chardonne–Mont Pèlerin funicular railway Funiculaire Vevey Chardonne MontPlerin VD Suisse

The line was constructed in 1899 and opened the following year. It is a single track of 1,000 mm (3 ft 3 38 in) ) with a passing point but is unusual in that it has three intermediate halts, at Corseaux, Chardonne and la Baume. The line rises from 393 m (1,289 ft) at Vevey to 807 m (2,648 ft) at its summit, a total of 414 m (1,358 ft) over its 1,584 m (5,197 ft) length, with a maximum gradient of 54% (1 in 1.84). Construction was by the Doppelmayr Von Roll consortium. Nowadays the line, which is electrically operated, is automatic with a journey time of 10 minutes.

Vevey–Chardonne–Mont Pèlerin funicular railway Funiculaire Vevey Chardonne MontPlerin Activit

The operating company became part of the Transports Montreux-Vevey-Riviera (MVR) in 2001 and is now marketed by the MOB (Montreux-Oberland Bernois) company under their GoldenPass services banner.

Vevey–Chardonne–Mont Pèlerin funicular railway httpsuploadwikimediaorgwikipediacommonsthu

Refurbishment

Vevey–Chardonne–Mont Pèlerin funicular railway Vevey MontPlerin funicular railway GoldenPass

In the summer of 2009 the line was closed for major infrastructure work to be carried out and at the same time the two carriages refurbished and rebranded in "Golden Pass" livery. The work, which was completed by 25 September 2009, and which involved the technical services of the Golden Pass group together with private enterprise cost just over CHF 4.8 million. During the work a replacement bus service was provided (as far as possible) to cover for the funicular journeys. The Golden Pass identity for the funicular, it is hoped, will give it more of a national and international naming and it is hoped will bring in more visitors through this branding. The new colours of the carriages will be applied to other funiculars in the Golden Pass Group as well as buses and trains, other than the Golden Pass Panoramic and Golden Pass Classic which they operate.

Access

Vevey–Chardonne–Mont Pèlerin funicular railway Funiculaire Vevey Chardonne Mont Plerin Wikipdia

The lower terminus (Vevey-Funiculaire terminus) of the line is served by the Riviera trolleybus system, specifically line 201 of VMCV.

References

Vevey–Chardonne–Mont Pèlerin funicular railway Wikipedia


Similar Topics