Carries
  
Sion Panvel Highway

Official name
  
Vashi Bridge

Opened
  
1997

Bridge type
  
Truss bridge

Location
  
Vashi, Mankhurd

Crosses
  
Thane Creek

Total length
  
1,837 m

Body of water
  
Thane Creek

Carry
  
Sion Panvel Highway

Vashi Bridge

Locale
  
Mankhurd, Mumbai Vashi, Navi Mumbai

Other name(s)
  
Thane Creek Bridge Mankhurd-Vashi Bridge 2nd Thane Creek Bridge

Constructed by
  
U.P State Bridge Corporation Ltd.

Address
  
Sion - Panvel Highway, Mumbai, Maharashtra

Similar
  
Airoli Bridge, Mumbai Trans Harbour, Shreepati Arcade, Worli Fort, Tulsi Lake

34 crossing the vashi bridge navi mumbai


The Vashi Bridge, also known as Thane Creek Bridge, is a bridge, built across the Thane Creek that connects the city of Mumbai to the Indian mainland at Navi Mumbai. The bridge links the suburb of Mankhurd in Mumbai with Vashi in Navi Mumbai, the satellite city of Mumbai. It is one of four entry points into Mumbai (other three being the Airoli Bridge, Mulund check naka and Dahisar check naka), and handles traffic directed towards the region to the south and east of Mumbai.

Contents

History

The first bridge to connect Mumbai to Navi Mumbai was built in 1973. The bridge is 1837m in length and has a substandard 3 lane carriageway. Within two years of its opening to traffic, corrosion cracks were noted on the bottom side of the prestressed girders of some spans. This led to a series of extensive repairs including external prestressing. It was simultaneously decided to construct a new bridge to replace the faulty one.

Construction on a new bridge began in 1987 and opened to traffic in 1992. The original Vashi Bridge or the 1st Thane Creek Bridge remains closed to traffic.

Construction

A new bridge having a 6 lane divided carriageway and length of 1837.35 m (30 m down stream) was constructed from 1987 to 1997 with several unique features in the construction and design with emphasis on durability and a formal QA/QC programme. Proof Consultants were appointed to oversee each aspect of planning, design and construction. Open foundations were taken into the bedrock with foundation concrete being laid in the dry, with the sea water being pumped out using submersible pumps. The piers in the intertidal zone were protected by epoxy coal tar paint painted on 6 mm thick m.s. plate which was considered as a lost shuttering. The superstructure was a P.S.C. box girder, one for each carriageway, constructed using balanced cantilever cast-in-situ segments. The new bridge (also the Vashi Bridge) has performed without any problems whatsoever. This bridge was constructed by U.P State Bridge Corporation Ltd. for which it was awarded the most outstanding concrete structure award.

The new bridge is also known as the 2nd Thane Creek Bridge.

References

Vashi Bridge Wikipedia