Girish Mahajan (Editor)

USS White Plains (AFS 4)

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Name
  
USS White Plains

Laid down
  
2 October 1965

Commissioned
  
23 November 1968

Construction started
  
2 October 1965

Length
  
177 m

Sponsored by
  
Mrs. Bob Wilson

Decommissioned
  
17 April 1995

Launched
  
26 July 1966

USS White Plains (AFS-4) wwwnavsourceorgarchives095209520407jpg

Uss white plains afs 4


USS White Plains (AFS-4) was the fourth Mars-class combat stores ship of the United States Navy. The ship was named after the city of White Plains, New York, scene of the Battle of White Plains during the American Revolutionary War.

Contents

Construction and commissioning

White Plains was laid down on 2 October 1965 by the National Steel and Shipbuilding Company in San Diego. She was launched on 26 July 1966, sponsored by Mrs. Bob Wilson, and commissioned at the Long Beach Naval Shipyard at Long Beach, California, on 23 November 1968, with Captain Thomas B. Brenner in command.

White Plains was used as the trial vessel for the class to mount the two Vulcan Phalanx CIWS. The ship retained the Phalanx systems after decision was made not to mount them on the rest of the class.

Service history

After fit out and shake down training, she began a series of Western Pacific deployments that made up the bulk of her career. Early deployments were in Vietnam's waters. Later deployments supported US Naval forces in the Persian Gulf.

In 1978 The USS White Plains was struck by the USS Mount Vernon during an underway replenishment operation.

In 1978 in the straits of Malacca the ship lost power and propulsion while being followed by a supertanker; collision was imminent, and the call went to man the life boat stations; collision was avoided, but it was a close call.

In the late 1980s, the ship was one of the first U.S. Navy ships to have women sailors aboard. By 1991, and after a berthing retrofit accomplished in overhaul, the ship had a complement of female officers, and female senior and junior enlisted aboard.

On 9 May 1989, while underway in the South China Sea en route to Guam, the White Plains experienced a major Class Bravo fire in the main engine room while conducting underway fuel replenishment with the combat replenishment ship USS Sacramento (AOE-1). The fire resulted from the ejection of a valve stem on the fuel transfer system which sent a high-pressure spray of fuel over the boiler and consequently ignited into a fireball. The cause of the valve stem ejection was from navy supply system black coated/painted fasteners, that were not the right type of metal (brass vs. copper) to withstand the pressure and heat of the system and environment. It was determined after an investigation that navy logistics had purchased the black coated fasteners for use on ship fuel systems, without confirming or inspecting their metal content. After the tragedy, a complete review of these fasteners was conducted navy wide. There were 6 fatalities and 161 injuries reported as a result of the fire.[1]

In January 1991 the White Plains was relieved from its deployment in the Persian Gulf by sister ship Niagara Falls.

In early August 1992, the ship received an extensive refit, including her main steam plant. Later that same month, as the ship was unable to be leave on its own power, its mooring lines were reinforced with anchor chain and steel cables to keep it moored to the pier as Typhoon Omar approached the island of Guam. On 27 August 1992, under the command of Capt. Robin Y. Weber, the ship weathered the initial pass of the eye of Super Typhoon Omar. After a relative calm and then the final pass of the eye of Typhoon Omar, White Plains was torn from her moorings. The ship with its skeleton crew rode out Omar's 150 mph winds in Apra Harbor. The ship ultimately ran aground on the coral beach. The responsibility for the safe mooring of a ship during repair lies with the shipyard. At the beginning of the repair availability the ships first lieutenant meet with Ship Repair Facility Guam engineers and developed a plan to moor the ship in the event of a typhoon. The plan took into account the surface area of exposed portions of the ship and pounds per square inch of expected force generated by typhoon winds along with the strength of pier cleats, bollards and deadmen. The plan required more lines than were a part of the ship's normal complement. An agreement was reached about which lines would be provided by the ship and which would be provided by the shipyard. All lines were to be of nylon construction. On the morning of the storm's approach the shipyard riggers used springlay mooring lines. Springlay is a combination of wire and synthetic fiber and does not stretch. Nylon mooring lines can stretch up to a third of their length with no damage to the line. Despite the first lieutenant's protest of the incompatibility of the two types of mooring lines, the shipyard's riggers claimed they had no other lines available. This resulted in the springlay mooring lines holding almost the full force of the winds while the strength of the nylon mooring lines was not fully utilized. The springlay lines gave way followed by the nylon lines. In the weeks following Typhoon Omar, the eyes of two other typhoons passed over the ship while still in the shipyard. During these events the original mooring plan was utilized using all nylon mooring lines and the ship rode out both typhoons with no problems.

Very fortunate to have run aground near Polaris Point, after the ship left the pier in the storm, the ship lost its only power source for a day, a notoriously fickle emergency diesel generator. The generator situation was corrected after several hours and troubleshooting, and ultimately solved by a simple observation made by the electrical officer, LTJG Lee, that a control governor mechanical linkage was undone. Essential power for emergency services were restored to the ship, enabling the crew to handle any flooding or fire that would occur. While the ship was aground for 3–5 days, the crew sustained on MREs, and helped plan, along with harbor operations, for her ungrounding. There was no real damage to the ship's hull.

The ship recovered completely from the grounding and was underway for Gulf operations in May 1993.

The ship, well past her life cycle and usefulness to the U.S. Navy, was decommissioned in 1995.

Disposal

White Plains was sunk as a target in the Pacific Ocean at 22°55′00.9″N 160°10′00.3″W, during the RIMPAC 02 exercise in waters 2,570 fathoms (15,420 feet; 4,700 meters) deep.

References

USS White Plains (AFS-4) Wikipedia