Neha Patil (Editor)

USS Northampton (CLC 1)

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Name
  
Northampton

Sponsored by
  
Mrs. Edmond J. Lampron

Decommissioned
  
8 April 1970

Construction started
  
31 August 1944

Builders
  
Bethlehem Steel, Quincy

Laid down
  
31 August 1944

Commissioned
  
7 March 1953

Length
  
206 m

Launched
  
27 January 1951

USS Northampton (CLC-1) USS Northampton CLC1 Task Fleet Command Ship CC1 Command

The third USS Northampton (CLC-1) was a US Navy command light cruiser (command ship). She was laid down as an Oregon City-class heavy cruiser (CA–125), on 31 August 1944 by the Fore River Yard, Bethlehem Steel Corp., Quincy, Massachusetts. Work suspended between 11 August 1945 and 1 July 1948; she was launched as CLC–1, on 27 January 1951; sponsored by Mrs. Edmond J. Lampron; and commissioned as CLC–1, on 7 March 1953, Captain William D. Irvin in command.

Contents

USS Northampton (CLC-1) TheBlueprintscom Blueprints gt Ships gt Battleships US gt USS CLC

History

USS Northampton (CLC-1) wwwvirhistorycomnavyshipscc1cc1hr01JPG

Following shakedown, Northampton reported for duty to Commander Operational Development Forces, Atlantic Fleet. For seven months she conducted extensive tests of her new equipment. Evaluation completed in September 1954 and she reverted to the operational control of Commander Battleship Cruiser Force, Atlantic Fleet. She next demonstrated her capabilities as a tactical Command Ship by serving as flagship, first for Commander Amphibious Force, Atlantic Fleet (October–November 1954) and then for Commander 6th Fleet (December 1954–March 1955). Between 1 September and 22 October she served as flagship for Commander Strike Force, Atlantic, a position she was to hold frequently over the next fifteen years.

USS Northampton (CLC-1) USS Northampton CLC1 Task Fleet Command Ship CC1 Command

On 24 February 1956, Northampton emerged from her first overhaul at the Norfolk Naval Shipyard, Portsmouth, Virginia, and, after refresher training off Cuba, participated as a unit of the Navy’s first guided missile division afloat, CruDiv 6, in the first public demonstration of the Terrier missile. In April, she steamed east for six months with the 6th Fleet, and, during the summer of 1957, resumed midshipmen training cruises. However, between that time and 1961, she infrequently returned to European waters. Deployed on occasion for NATO and fleet exercises and People to People visits, the command ship was visited by high government officials of various European countries, including Kings Baudouin I of the Belgians and Olav V of Norway.

Decommissioning

USS Northampton (CLC-1) USS Northampton CLC1 Wikipedia

Redesignated CC–1 on 15 April 1961, Northampton remained in the western Atlantic until decommissioning in February 1970. Her cruises ranged from Canadian to Panamanian waters as she extensively tested and evaluated new communications equipment and played host to visiting national and international dignitaries, including Presidents John F. Kennedy and Lyndon B. Johnson. The ship was eventually withdrawn from service, and was stricken from the Naval Vessel Register on 31 December 1977.

"Floating White House"

USS Northampton (CLC-1) USS Northampton CLC1

According to a Washington Post article on 29 July 2006, Northampton was part of the U.S. government's plan for Continuity of Operations and reported to be a "floating White House" to which the President could be evacuated in the event of nuclear attack. As such she was designated as the National Emergency Command Post Afloat (NECPA). Wright was her sister ship and also designated part of NECPA. The ship was modified with an extra deck, the tallest communications mast in the Navy and multi-link communications gear.

Awards

  • National Defense Service Medal (2 awards)
  • References

    USS Northampton (CLC-1) Wikipedia