Rahul Sharma (Editor)

USS Alaska (CB 1)

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Name
  
USS Alaska

Ordered
  
9 September 1940

Commissioned
  
17 June 1944

Construction started
  
17 December 1941

Length
  
246 m

Namesake
  
Territory of Alaska

Laid down
  
17 December 1941

Decommissioned
  
17 February 1947

Launched
  
15 August 1943

Beam
  
28 m

USS Alaska (CB-1) Cruiser Photo Index USS ALASKA CB1 Navsource Photographic

Builder
  
New York Shipbuilding Corporation

USS Alaska (CB-1) was the lead ship of the Alaska class of large cruisers which served with the United States Navy during the end of World War II. She was the first of two ships of her class to be completed, followed only by Guam; four other ships were ordered but were not completed before the end of the war. Alaska was the third vessel of the US Navy to be named after what was then the territory of Alaska. She was laid down on 17 December 1941, ten days after the outbreak of war, was launched in August 1943 by the New York Shipbuilding Corporation, in Camden, New Jersey, and was commissioned in June 1944. She was armed with a main battery of nine 12 in (300 mm) guns in three triple turrets and had a top speed of 33 kn (61 km/h; 38 mph).

Contents

Due to being commissioned late in the war, Alaska saw relatively limited service. She participated in operations off Iwo Jima and Okinawa in February–July 1945, including providing anti-aircraft defense for various carrier task forces and conducting limited shore bombardment operations. She shot down several Japanese aircraft off Okinawa, including a possible Ohka piloted missile. In July–August 1945 she participated in sweeps for Japanese shipping in the East China and Yellow Seas. After the end of the war, she assisted in the occupation of Korea and transported a contingent of US Army troops back to the United States. She was decommissioned in February 1947 and placed in reserve, where she remained until she was stricken in 1960 and sold for scrapping the following year.

USS Alaska (CB-1) Cruiser Photo Index USS ALASKA CB1 Navsource Photographic

Design

USS Alaska (CB-1) USS Alaska CB1 Wikipedia

Alaska was 808 feet 6 inches (246.43 m) long overall and had a beam of 91 ft 1 in (27.76 m) and a draft of 31 ft 10 in (9.70 m). She displaced 29,779 long tons (30,257 t) as designed and up to 34,253 long tons (34,803 t) at full combat load. The ship was powered by four-shaft General Electric geared steam turbines and eight oil-fired Babcock & Wilcox boilers rated at 150,000 shaft horsepower (110,000 kW), generating a top speed of 33 knots (61 km/h; 38 mph). The ship had a cruising range of 12,000 nautical miles (22,000 km; 14,000 mi) at a speed of 15 kn (28 km/h; 17 mph). She carried four OS2U Kingfisher or SC Seahawk seaplanes, with a pair of steam catapults mounted amidships.

USS Alaska (CB-1) Naval Warfare USS Alaska CB1

The ship was armed with a main battery of nine 12 inch L/50 Mark 8 guns in three triple gun turrets, two in a superfiring pair forward and one aft of the superstructure. The secondary battery consisted of twelve 5-inch L/38 dual-purpose guns in six twin turrets. Two were placed on the centerline superfiring over the main battery turrets, fore and aft, and the remaining four turrets were placed on the corners of the superstructure. The light anti-aircraft battery consisted of 56 quad-mounted 40 mm (1.6 in) Bofors guns and 34 single-mounted 20 mm (0.79 in) Oerlikon guns. A pair of Mk 34 gun directors aided gun laying for the main battery, while two Mk 37 directors controlled the 5-inch guns and a Mk 57 director aided the 40 mm guns. The main armored belt was 9 in (229 mm) thick, while the gun turrets had 12.8 in (325 mm) thick faces. The main armored deck was 4 in (102 mm) thick.

Service history

Alaska was authorized under the Fleet Expansion Act on 19 July 1940, and ordered on 9 September. On 17 December 1941 she was laid down at New York Shipbuilding in Camden, New Jersey. She was launched on 15 August 1943, sponsored by the wife of the governor of Alaska, after which fitting-out work was effected. The ship was completed by June 1944, and was commissioned into the US Navy on 17 June, under the command of Captain Peter K. Fischler.

After her commissioning, Alaska steamed down to Hampton Roads, escorted by the destroyers Simpson and Broome. The ship was then deployed for a shakedown cruise, first in the Chesapeake Bay and then into the Caribbean, off Trinidad. On the cruise she was escorted by the destroyers Bainbridge and Decatur. After completing the cruise Alaska returned to the Philadelphia Navy Yard for some minor alterations, including the installation of four Mk 57 fire control directors for her 5-inch guns. On 12 November she left Philadelphia in the company of the destroyer-minelayer Thomas E. Fraser, bound for two weeks of sea trials off Guantanamo Bay, Cuba. On 2 December she left Cuba for the Pacific, transiting the Panama Canal two days later, and reaching San Diego on 12 December. There her gun crews trained for shore bombardment and anti-aircraft fire.

Pacific deployment

On 8 January 1945, Alaska left California for Hawaii, arriving in Pearl Harbor on 13 January. There she participated in further training and was assigned to Task Group 12.2, which departed for Ulithi on 29 January. The Task Group reached Ulithi on 6 February and was merged into Task Group 58.5, part of Task Force 58, the Fast Carrier Task Force. Task Group 58.5 was assigned to provide anti-aircraft defense for the aircraft carriers; Alaska was assigned to the carriers Enterprise and Saratoga. The fleet sailed for Japan on 10 February to conduct air strikes against Tokyo and the surrounding airfields. The Japanese did not attack the fleet during the operation. Alaska was then transferred to Task Group 58.4 and assigned to support the assault on Iwo Jima. She served in the screen for the carriers off Iwo Jima for nineteen days, after which time she had to return to Ulithi to replenish fuel and supplies.

Alaska remained with TG 58.4 for the Battle of Okinawa. She was assigned to screen the carriers Yorktown and Intrepid; the fleet left Ulithi on 14 March and reached its operational area southeast of Kyushu four days later. The first air strikes on Okinawa began that day, and claimed 17 Japanese aircraft destroyed on the ground. Here, Alaska finally saw combat, as the Japanese launched a major air strike on the American fleet. Her anti-aircraft gunners destroyed a Yokosuka P1Y bomber attempting to crash into Intrepid. Shortly thereafter, Alaska was warned that American aircraft were in the vicinity. About ten minutes later, her gunners spotted an unidentified aircraft, approaching in what they thought was a threatening manner; they shot down what turned out to be an F6F Hellcat fighter, though the pilot was uninjured. Later that afternoon, Alaska shot down a second Japanese bomber, a Yokosuka D4Y.

The following day, the carrier Franklin was badly damaged by several bomb hits and a kamikaze. Alaska and her sister Guam, two other cruisers, and several destroyers were detached to create Task Group 58.2.9 to escort the crippled Franklin back to Ulithi. On the voyage back to port, another D4Y bomber attacked Franklin, though the ships were unable to shoot it down. Gunfire from one of the 5-inch guns accidentally caused flash burns on several men standing nearby; these were the only casualties suffered by her crew during the war. Alaska then took on the role of fighter director; using her anti-air search radar she vectored fighters to intercept and destroy a Kawasaki Ki-45 heavy fighter. On 22 March, the ships reached Ulithi and Alaska was detached to rejoin TG 58.4.

After returning to her unit, Alaska continued to screen for the aircraft carriers off Okinawa. On 27 March she was detached to conduct a bombardment of Minamidaitō. She was joined by Guam, two light cruisers, and Destroyer Squadron 47. On the night of 27–28 March, she fired forty-five 12-inch shells and three hundred and fifty-two 5-inch rounds at the island. The ships rejoined TG 58.4 at a refueling point, after which they returned to Okinawa to support the landings when they began on 1 April. On the evening of 11 April, Alaska shot down one Japanese plane, assisted in the destruction of another, and claimed what might have been an Ohka piloted rocket-bomb. On 16 April, the ship shot down another three aircraft and assisted with three others. Throughout the rest of the month, her heavy anti-aircraft fire succeeded in driving off Japanese bombers.

Alaska then returned to Ulithi to resupply, arriving on 14 May. She was then assigned to TG 38.4, the reorganized carrier task force. The fleet then returned to Okinawa, where Alaska continued in her anti-aircraft defense role. On 9 June, she and Guam bombarded Oki Daitō. TG 38.4 then steamed to San Pedro Bay in the Leyte Gulf for rest and maintenance; the ship remained there from 13 June until 13 July, when she was assigned to Cruiser Task Force 95 along with her sister Guam, under the command of Rear Admiral Francis S. Low. On 16 July, Alaska and Guam conducted a sweep into the East China and Yellow Seas to sink Japanese shipping vessels. They had only limited success, however, and returned to the fleet on 23 July. They then joined a major raid, which included three battleships and three escort carriers, into the estuary of the Yangtze River off Shanghai. Again, the operation met with limited success.

Post-war operations

In the course of her service during World War II, Alaska was awarded three battle stars. On 30 August Alaska left Okinawa for Japan to participate in the 7th Fleet occupation force. She arrived in Incheon, Korea on 8 September and supported Army operations there until 26 September, when she left for Tsingtao, China, arriving the following day. There, she supported the 6th Marine Division until 13 November, when she returned to Incheon to take on Army soldiers as part of Operation Magic Carpet, the mass repatriation of millions of American servicemen from Asia and Europe. Alaska left Incheon with a contingent of soldiers bound for San Francisco. After reaching San Francisco, she left for the Atlantic, via the Panama Canal, which she transited on 13 December. The ship arrived in the Boston Navy Yard on 18 December, where preparations were made to place the ship in reserve. She left Boston on 1 February 1946 for Bayonne, New Jersey, where she would be berthed in reserve. She arrived there the following day, and on 13 August, she was removed from active service, though she would not be decommissioned until 17 February 1947.

Conversion proposals

In 1958, the Bureau of Ships prepared two feasibility studies to see if Alaska and Guam were suitable to be converted to guided missile cruisers. The first study involved removing all of the guns in favor of four different missile systems. At $160 million this was seen as too costly, so a second study was conducted. This study left the forward batteries—the two 12″ triple turrets and three of the 5" dual turrets—in place and added a reduced version of the first plan for the aft. This would have cost $82 million, and was still seen as too cost-prohibitive. As a result, the conversion proposal was abandoned and the ship was instead stricken from the naval registry on 1 June 1960. On 30 June she was sold to the Lipsett Division of Luria Brothers to be broken up for scrap.

Awards

  • Asiatic-Pacific Campaign Medal with three battle stars
  • World War II Victory Medal
  • Navy Occupation Medal
  • China Service Medal
  • References

    USS Alaska (CB-1) Wikipedia