Trianel Windpark Borkum

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
Germany

Type
  
offshore

Operator
  
Trianel GmbH

Nameplate capacity
  
200

Max. water depth
  
33 m

Status
  
Operational

Rotor diameter
  
116 m

Construction began
  
September 2011

Commission date
  
July 2015

Trianel Windpark Borkum wwwoffshorewindindustrycomsitesdefaultfilesf

Owner(s)
  
Trianel + 33 municipal utilities

Distance from shore
  
45 km (65.6 km for center)

Location
  
45 km North of Borkum island

Construction cost
  
EUR900m (Phase 1) ? (Phase 2)

Trianel windpark borkum


Trianel Windpark Borkum (formerly Borkum West II) is an offshore wind farm near Borkum. Its first phase of 40 turbines rated at a total power of 200 MW is operational, with a planned, additional 200 MW in a second phase. The project was approved for construction in 2008 and will cost over €1 billion to construct once fully operational (€900m for phase I alone). Originally known as Borkum West II the name was changed to Trianel Windpark Borkum in early 2013.

Contents

Phase 1 of the installation was completed in the 4th quarter of 2014 and consist of 40 Areva M5000-116 turbines (5 MW turbines) on Tripod foundations. It was connected to the grid in August 2015. In the six months before March 2016 the wind farm produced 452.33 GWh, i.e. a capacity factor of 51.6%.

In September 2016 Senvion was awarded a conditional contract for the second phase, for 32 upgraded 6.2M152 turbines rated at a total power of 203 MW. A final investment decision is expected in the first half of 2017 after which construction could start in early 2018 for a planned completion in the fall of 2019.