Trisha Shetty (Editor)

Trans Gabon Railway

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Native name
  
Transgabonais

Opened
  
1987

Stations
  
23

Terminis
  
Status
  
Active

System
  
Heavy rail

Line length
  
669 km (416 mi)

Trans-Gabon Railway ETF upgrades the TransGabon Railway

Track gauge
  
1,435 mm (4 ft 8 1⁄2 in) standard gauge

Trans gabon railway


The Trans-Gabon Railway (French: Transgabonais) is the only railway in Gabon. It runs 670 km east from Owendo port station in Libreville to Franceville via numerous stations, the main ones being Ndjolé, Lopé, Booué, Lastoursville and Moanda.

Contents

Trans-Gabon Railway africa pictures

History

Trans-Gabon Railway Transgabonnais GP40 at Lope a photo on Flickriver

A railway was first planned in 1885. Investigations into the line were conducted in 1968, funding was agreed in 1973, and construction began the following year. The first section, from Owendo to Ndjolé, opened in 1978, with the remaining sections opening in stages until December 1986. Costs were well over budget and almost bankrupted the country.

Trans-Gabon Railway httpswwwsaliniimpregilocomstaticuploadgab

The Trans-Gabon Railroad is overall adjacent the Ogooue River until Ndjolé. Most important constructions are the Juckville Tunnel, the viaduct over the Abanga swamp, and the bridge over the confluence between the Ogooue and the Ivindo Rivers.

The line to Franceville was completed in 1987.

Trans-Gabon Railway Modernisation of the TransGabon railway Socit dingenierie

Originally intended to reach Makokou and carry iron ore, its route was changed for political reasons, namely to keep within national borders managanese ore traffic that went on the COMILOG Cableway via the Republic of Congo. When the railway reached the manganese mine at Moanda, the Cableway was closed.

Trans-Gabon Railway Train travel in Gabon SETRAG trains Libreville to Franceville

The railway was privatised in 1999. Plans regularly surface proposing an extension to Brazzaville in the Republic of the Congo.

Construction and specifications

Trans-Gabon Railway Conventional Rail Socit dingenierie leader du transport public

Because the line was built well into the era of earthmoving machinery, the need to choose a narrow gauge to save costs was no longer important. However the choice of standard gauge (1,435 mm (4 ft 8 12 in)) took advantage of off the shelf equipment. It was constructed by a consortium of Impregilo, Astaldi, Philipp Holzmann, Constructions Et Entreprises Industrielles and Entreprise De Construction Franco-Africaine.

Recent history

In 2003 Hughes Network Systems (see Hughes Communications) installed a satellite based telephony system into all the railway stations of the railway.

In June 2006 a new line for iron ore from Belinga to port was announced. Unclear if it will use part of existing line. Would be standard gauge. This line was supposed to open in 2012, but in 2014 completion is still awaited.

Two EMD JT42CWR locomotives shipped September 2011. A further 4 locomotives and 10 passenger coaches were also ordered.

Network

There are no links with the adjacent states of Equatorial Guinea, Cameroon, or the Republic of the Congo. The railway is important for transporting timber and uranium in addition to being the only important public transport route in the nation. In 1996, the railway carried 3MT of freight and 190,000 passengers. The Trans-Gabon Railway, 669 km (416 mi) has 23 stations.

Trivia

  • The Trans-Gabon Railway is one of the few Central African railways which was not built during the colonial period.
  • The Trans-Gabon Railway crosses the Ogooue River five times, at Franceville, at Ndjolé, and three times around Booué.
  • References

    Trans-Gabon Railway Wikipedia