Trans Austria Gas Pipeline

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
Austria

To
  
Arnoldstein

General direction
  
east-west

Type
  
natural gas

From
  
Baumgarten an der March

Passes through
  
Eggendorf, Grafendorf, St. Margrethen, Weitendorf, Ettendorf, Waisenberg, Ebenthal, Finkenstein am Faaker See

The Trans Austria Gas (TAG) pipeline is a natural gas pipeline that leads from the Slovak-Austrian border at Baumgarten an der March to Arnoldstein in the south, near the border with Italy. Natural gas originating from Russia is transported to and used in Italy and Austria. In addition, it supplies Slovenia through the SOL Pipeline System (Süd - Ost - Leitung), which branch-off at Weitendorf.

Contents

Technical features

The pipeline is 380 kilometres (240 mi) long. The original two lines date back to the 1960s, but in 2006 the pipeline was extended by adding the third line. The extension cost US$157 million.

The capacity of the pipeline is 41 billion cubic meters (bcm) of natural gas annually. The construction of two additional compression stations will increase the capacity to 47.5 bcm by end 2008.

Pipeline company

The pipeline is managed by Trans Austria Gasleitung GmbH (TAG GmbH), a partnership of Eni and OMV. Eni owns 89% of TAG and manages the pipeline, with OMV holding the remainder.

Antitrust case

Since 2007, the European Commission has been probing Eni's alleged restrictive practices on the TAG, Transitgas and TENP pipelines by limiting third parties access to the pipelines. The hearing is set for 27 November 2007. To end the case, Eni is studying the possible sale of the pipeline.