Status Complete Completed 2012 Structural engineer Arup Opened 2012 Construction started 2010 | Type Office Roof 140 metres (459 ft) Height 140 m Architecture firm Kohn Pedersen Fox Floor count 30 | |
![]() | ||
Address Via Mike Bongiorno, 20124 Milano, Italy Similar Unicredit Tower, Torre Solaria, Porta Nuova, Palazzo Lombardia, Torre Breda |
Oficina en torre diamante mpg
The Diamond Tower (in Italian Torre Diamante or colloquially Diamantone) is a high-rise in Milan Centro Direzionale, on the corner of viale Della Liberazione and via Galilei. It was built in the context of the urban requalification project called “Progetto Porta Nuova” (Porta nuova project).
Contents
- Oficina en torre diamante mpg
- Departamentos de lujo torre diamante zapopan
- Design
- Construction
- References
The high-rise is 140 meters tall, making it the fourth building in Milan by height and the fifth in Italy (furthermore, it is the highest steel edifice in Italy).
The tower has a multifaceted structure, which recalls the shape of a diamond (from which, indeed, derives the name).
The building is surrounded by some lower constructions, called Diamantini (small diamonds), functioning as continuities of the high-rise. The Diamond tower and the Diamantini are commercial buildings.
The principal tenant is BNP Paribas bank since 2016.
Departamentos de lujo torre diamante zapopan
Design
The Italian-American architect Lee Polisano, member of Kohn Pedersen Fox studio, designed the entire area master plan. Polisano was supported by architect Paolo Caputo and by Jacobs Engineering Group Inc. for the architectural design while the structural plan was committed to Arup.
The main feature of the tower is its irregular geometry: the perimeter columns of the building are inclined compared to the vertical. The inner layout is characterised by a central core around which the floors develop. This solution has been adopted to maximise the amount of sunlight passing through the building and to allow a view on the city.
One of the goals of the “Porta Nuova” project is to drastically reduce energy consumption: all the buildings will be provided with sources of renewable energy. The Diamond Tower has in fact been awarded with the LEED GOLD certification, one of the highest ranking recognised by the Green Building Council.
Construction
The construction of the building officially began on 28 January 2010 with the assembly of the cranes. On 1 August the installation of the external structure and the inner concrete core started. After about nine months, the tower had reached six floors. At the beginning of the new year, it rose to ten floors and the installation of the glass panels began. The construction continued quickly and, in March, it arrived at eighteen floors.
On 5 June, the inner concrete core reached the maximum height of the building (140m) and on the top the Italian flag was placed. After about 5 months, in November 2011, the external steel structure had reached the maximum height while the laying of the glass panels arrived at the eighth floor. On 10 February, the glass panels reached eighteen floors, on the 30th March the twenty-two and in mid-April the twenty-seven. During the rest of April, the laying of the panels continued in order to complete the installation by the end of the month. The tower was completed on 14 September 2012.
A characteristic of the tower is the use of laminated glass instead of tempered glass in order to have a façade uniformity and to avoid minor flaws such as the undulation typical of industrial tempered glass.
Another peculiarity of the building is the lighting of its top in various colours, e.g. blue or red.