Supriya Ghosh (Editor)

Telfer, Western Australia

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Population
  
464 (2006 census)

State electorate(s)
  
Pilbara

Mean min temp
  
Annual rainfall

Postal code
  
6762

Lga
  
Shire of East Pilbara

Postcode(s)
  
6762

Mean max temp
  
Mean min temp

Elevation
  
292 m

Federal division
  
Division of Durack

Telfer, Western Australia httpsuploadwikimediaorgwikipediacommonsthu

Location
  
1,900 km (1,181 mi) from Perth 450 km (280 mi) from Port Hedland

Telfer is a minesite in the Pilbara region of Western Australia, within the Great Sandy Desert. Telfer was previously the state's most isolated town, located 1,300 kilometres (808 mi) north-east of the state capital Perth. The gold and copper mine is run by Newcrest Mining, and is the second-largest gold mine in Australia.

Contents

Map of Telfer WA 6762, Australia

History

Newmont Mining first made a claim to the deposit in 1972; however, this is disputed by Jean-Paul Turcaud to this date.

The town of Telfer, non-existent until then, was built by Newmont in 1976 and named after A.H. Telfer, a former under secretary for mines in Western Australia. The town grew to a peak of almost 1,000 inhabitants in the early 1990s, with services like a supermarket, a police station, a bank, a community hall, a library and a number of sporting facilities being available.

The mine opened in 1977 as a joint venture between BHP Billiton and Newmont Mining. In 1990, a merger between Newmont Australia Limited and BHP Gold Limited resulted in the creation of Newcrest Mining, with ownership of the Telfer Mine now lying with Newcrest.

Telfer's demographic characteristics were typical of a northern Western Australian mining town in the time period. It had a male to female ratio of 2.4 to 1 and almost 40 percent of its population was born overseas. Half its population was below the age of 35 and the town experienced an annual population turnover of almost 20 percent.

In 1996, the town suffered the decision to move the Telfer mine from residential to a fly-in fly-out workforce. Many of the commercial services were withdrawn; only the recreational facilities were maintained. The existing housing was now used for the accommodation of the mine's mobile work force. One of the main reasons for the town's closure was that fly-in fly-out rosters gave the mine access to a larger skilled work force and to people that would otherwise have been unwilling to relocate to a remote location like Telfer.

Open-cut mining was suspended in August 2000 due to high operating costs. High production costs were primarily caused by the presence of cyanide soluble copper in the open pit ore.

In 2002, Newcrest Mining announced a new redevelopment project worth $1 billion, after discovering new mineral areas and a reserve base of some 19 million troy ounces of gold and 640,000 tonnes (710,000 short tons) of copper. The mine reopened in November 2004, after commissioning of the processing plant and, initially as an open cut mine, from March 2006 also with an underground operation.

Climate

Telfer has a semi arid climate with extremely hot summers and warm winters. Summer highs average at 40 °C (104 °F) and winter highs at 25 °C (77 °F). It receives an average annual rainfall of approximately 370 millimetres (15 in), despite the fact that it lies relatively close to the Indian Ocean. This location leaves the community vulnerable to tropical cyclones. For example, Cyclone Graham affected the area in early 2003, delivering 163mm of rain. Severe Tropical Cyclone Laurence also passed over the mine site in December 2009.