From: Te Maunga Major cities Tauranga | Length 23 km Towns Mount Maunganui, Papamoa | |
Tauranga eastern link toll road
The Tauranga Eastern Link (TEL) is a four lane motorway in the Bay of Plenty region in New Zealand, covering 23 km from Te Maunga junction in Tauranga to Paengaroa. It was officially opened on 30 July 2015. It replaced a section of State Highway 2, improving access to Tauranga from the east (Te Puke, Whakatane, Opotiki, Gisborne) and south (Rotorua and Taupo). It became the main route for trucks heading to the Port of Tauranga from Rotorua and the eastern Bay of Plenty, and connected the Central Plateau forestry industry with the port to facilitate lumber export.
Contents
- Tauranga eastern link toll road
- Map of Tauranga Eastern Link Papamoa Beach Papamoa New Zealand
- Tauranga eastern link tolling animation
- Design
- Objectives
- Route
- Toll
- References
Map of Tauranga Eastern Link, Papamoa Beach, Papamoa, New Zealand
Tauranga eastern link tolling animation
Design
The Tauranga Eastern Link is a four lane, dual carriageway, providing a safer and more direct route between Tauranga to Paengaroa.
Objectives
Construction of the Tauranga Eastern Link officially started on 19 November 2010 and was due for completion in 2016, however construction ran six months ahead of schedule and the project was officially opened in late July 2015.
Tolling received significant community support (92% both conditional and unconditional) and as a result the NZTA submitted a tolling proposal to the Cabinet who approved it.
Route
The Tauranga Eastern Link begins at the Te Maunga Roundabout in Tauranga and follows the route of the existing SH 2 to Domain Road, with junctions at Sandhurst Road /Mangatawa Road and Domain Road/Tara Road. The route then runs across rural land, parallel to Tara Road, before crossing Parton Road and running along the sandhills to the Kaituna River. At this point the highway crosses the river on a 150m long bridge and runs past the Kaituna Wildlife Management Reserve. It then heads south east across dairy farms and orchards before crossing the railway line and terminating at a roundabout north of Paengaroa.
Toll
Since official opening on 3 August 2015 tolls for a single one-way trip are: