Neha Patil (Editor)

Stuttgart Bad Cannstatt station

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
DS100 code
  
TSC

Category
  
3

Address
  
70372 Stuttgart, Germany

Station code
  
6077

Platforms in use
  
8

IBNR
  
8005769

Website
  
www.bahnhof.de

Opened
  
22 October 1845

Architectural style
  
Rundbogenstil (1845)

Stuttgart-Bad Cannstatt station

Location
  
Bahnhofstr. 30, Stuttgart, Baden-Württemberg Germany

Line(s)
  
Fils Valley Railway (KBS 750, KBS 790.1) Rems Railway (KBS 786, KBS 790.2-3) Access line to Stuttgart-Untertürkheim freight yard

Similar
  
Stuttgart Hauptbahnhof, Stuttgart Stadtmitte Station, Stuttgart Schwabstraße station, Stuttgart Flughafen/Messe station, Stuttgart Nürnberger Straße st

Bad Cannstatt station is the second largest station of the German city of Stuttgart after Stuttgart Hauptbahnhof and has eight platform tracks. Together with Untertürkheim station, it is the oldest station in Württemberg.

Contents

History

During the planning of the original railway in Württemberg, the Württemberg Central Railway (German: Württembergische Centralbahn), it was proposed to provide a station for the city of Cannstatt with its 5,500 inhabitants. The original proposal for the line consisted of a connection between the proposed Stuttgart Central Station to Cannstatt, where it would branch towards Esslingen and Ludwigsburg. Because of Stuttgart’s geographical location, the route via Cannstatt was the only feasible route for a railway with the technology of the time.

On 5 October 1845, the first railway in Württemberg was opened from Cannstatt to Untertürkheim. Following the completion of the Rosenstein Tunnel on 4 July 1846, the first train ran into Stuttgart station on 26 September 1846.

With increasing traffic, Cannstatt needed a new station. The old district town and spa of Cannstatt and Stuttgart had grown together. The current station building was built during the First World War.

Originally there were magnificent hotels for the many guests of the spa. A plastic sculpture, called Schienenhaufen (rail piles) by Karl-Heinz Franke, was installed in the forecourt in 1985, commemorating the opening of the first railway in Württemberg 140 years earlier.

A comprehensive modernisation of the station was completed for the 2006 FIFA World Cup in May 2006, after 20 months of work. Lifts were installed to provide barrier-free access to the platforms and the platform paving was renewed, while the listed platform canopies were preserved. The underpass running under the station was rebuilt with granite and the forecourt to the south facing the Cannstatter Wasen was refurbished. The costs were around €6 million to Deutsche Bahn, with additional funds from the state's Municipal Transport Financing Act (Gemeindeverkehrsfinanzierungsgesetz), the City of Stuttgart and the Stuttgart Region.

Prospects

In the course of the Stuttgart 21 rail project, various modifications to the station are planned. The tracks at the western end of the station will be replaced by new lines being built as part of the project. Platforms 2 (tracks 2 and 3) and 3 (tracks 4 and 5) will be shortened, and according to DB information will no longer be used.

Entrance building

The first station building in Cannstatt was probably designed by Michael Knoll, who developed Karl Etzel's plans for the First Stuttgart Central Station (Stuttgarter Centralbahnhof). The construction of the two-story, small building commenced in 1844 parallel with the Stuttgart station. The extremely simple, narrow building in Cannstatt had ten parallel axes and a side projection. In it, on the ground floor, were the office of the station manager, two waiting rooms, the cash room and a luggage room. On the first floor were living rooms and a conference room. Close to the station building there was a turntable. A carriage and an engine shed were arranged to the left and the right symmetrically. There was also the beginning of a freight shed.

The obligation to save money and the resulting small size of the buildings soon led to problems. The crowded station buildings in Cannstatt and Ludwigsburg were noted by the director of the Württemberg railway in 1849. In 1860 two stories added to the city side of the station building and by 1886 an arcaded porch was added.

Martin Meyer designed a new station that was completed in 1915, including an entrance building with three wings. The raised middle section is covered with a hipped roof. The main facade is divided symmetrically. Three tall windows brighten the lobby. A two storey wing extends to the left and a one-storey wing extends to the right of the central building. The station administration is housed at the higher level of the left wing with its round windows. Also care was taken to build functionally and not in the neoclassical or Art Nouveau styles. The main entrance is decorated with the figures of Zeus, Hermes and Athena.

Current operations

Bad Cannstatt station is a railway junction, where traffic from Stuttgart Hauptbahnhof on the Fils Valley Railway separates from the Rems and the Murr Railways. Here tracks 1 to 4 are used for regional traffic and tracks 5-8 are used for long-distance traffic. The tracks to and from Waiblingen run in each case between the tracks to and from Esslingen, the tracks are disentangled east of the station. Nowadays tracks 2 and 3 are used only by the S-Bahn, the other tracks are used by regional services.

Bad Cannstatt station is classified by Deutsche Bahn as a category 3 station.

Stadtbahn

The station has no direct links to the Stuttgart Stadtbahn. However, it is only 200 metres from the station on Wilhelmsplatz station on the following lines:

References

Stuttgart-Bad Cannstatt station Wikipedia