Station code STA DfT category C1 Opened 1962 | Grid reference SJ918229 2011/12 1.842 million Number of platforms 5 (1,3,4,5,6) | |
![]() | ||
Address Stafford ST16 2AA, United Kingdom Similar Hednesford railway station, Penkridge railway station, Cannock railway station, Crewe railway station, Rugeley Trent Valley rail |
Stafford railway station 10th august 2016
Stafford railway station serves the county town of Stafford in Staffordshire, England. As it lies at the junction of the Trent Valley Line and the Rugby-Birmingham-Stafford Line, it is an important main line interchange station on the West Coast Main Line.
Contents
- Stafford railway station 10th august 2016
- An afternoon at stafford railway station 18th april 2016
- History
- The station today
- Stafford Area Improvements Programme
- Stafford resignalling
- Services
- Southbound rail services
- Northbound rail services
- Rail replacement bus services
- Future services
- References
Stafford station formerly served the now defunct Stafford to Uttoxeter and Stafford to Shrewsbury Lines. The present station, built in 1962, is the fourth station to have existed on this site.
An afternoon at stafford railway station 18th april 2016
History
The first station was built by the Grand Junction Railway and opened in July 1837. It soon became inadequate and was replaced by a second station in 1844. A third station was built in 1862 which was eventually replaced by the current concrete brutalist building in 1962, built as part of the modernisation programme which saw the electrification of the West Coast Main Line.
Lines originally built by the Stafford and Uttoxeter Railway and the Shropshire Union Railways and Canal Company (to Shrewsbury) also used the station. The Stafford to Uttoxeter line closed to passenger traffic in 1939, with the Shrewsbury line closing as part of the Beeching Axe in 1964.
Following the rebuilding the station between 1961 and 1962 by the architect William Robert Headley, Isabel, a narrow gauge engine built by local firm W.G. Bagnall stood on a plinth on the opposite side of Station Road at the junction of Railway Street, until it was removed in the mid-1980s. Called Isabel, it is now on the Amerton Railway.
Two accidents have happened at Stafford, both in recent years:
The station today
There are five platforms in use at the station, all of which are accessible from either of the main lines that converge from the south. Platform 1 is used by Virgin Trains and London Midland services to London Euston, platform 3 by Virgin Trains and London Midland services from London Euston, platform 4 by Arriva Trains Wales, London Midland and CrossCountry services to Birmingham New Street, platform 5 by CrossCountry, Arriva Trains Wales and London Midland services from Birmingham New Street and platform 6 by starting/terminating London Midland services to/from London Euston, Birmingham New Street, Northampton, Stoke-on-Trent, Crewe and Liverpool Lime Street. However, due to the West Coast Main Line upgrade, which was completed on the 29-31 August 2015, any train can use any platform in any direction should a problem arise.
Platform 6 used to be the terminus of the Chase Line from Walsall and Birmingham, however this service has now been cut back since December 2008 to Rugeley Trent Valley, it is also used for Railtours and is split into "a" and "b" sections. The former bay platform 2 is no longer used by passenger trains nor the western most platform last used by Royal Mail trains. The Western Most Platform has now been converted into a Single Goods Line, with bi-directional operation. This was completed during the bank holiday weekend of the 29-31 August 2015.
In October 2012 Network Rail began refurbishment works at the station, due to the poor condition of some of the structures. The work included resurfacing the platforms (Platforms 1 and 3 had been completed before the works), improving surface and roof drainage, renewing the opaque glazing on the footbridge, installing new canopy roof covers on the platforms and some structural work on the platform supports.
In June 2015 Virgin Trains unveiled £1 million plans to refurbish the entrance, ticket hall and foyer. The worked started in November in the same year and was anticipated to be completed within 20 weeks. These were completed March 2016. The changes saw the ticket machines at the station double, WHSmith relocate to the former travel centre, the travel centre added onto the current ticket purchasing area and Starbucks take the place of Pumpkin Café Shop. The Cafe was also shortened to allow an increased size of the waiting area.
The station is a popular location for trainspotters and enthusiasts due to its high volume of through traffic - including many freight movements - and good visibility.
The station was featured on Trainspotting Live on 13 July 2016, where Tim Dunn set out to find the British Rail Class 325.
Stafford Area Improvements Programme
The Stafford Area Improvements Programme by Network Rail aims to allow more trains to run and also aims to reduce journey times by removing key bottlenecks in the area around Stafford.
Stafford resignalling
The resignalling aspect of the programme was completed over the bank holiday weekend of 29-31 August 2015. All platforms now have bi-directional signalling, and the goods loop is now operational.
The last train was signalled in the early hours of 29 August 2015, and the first train was signalled from Rugby ROC on the morning of 1 September 2015.
Services
From the south, two branches of the West Coast Main Line meet here: the Trent Valley Line and the Birmingham line. To the north, the trunk of the line continues towards Crewe, whilst the Manchester branch goes on to Stoke-on-Trent.
The station is currently served by four train operators (Virgin Trains, London Midland and CrossCountry, with limited services from Arriva Trains Wales) and rail replacement bus services.
Typical weekday off-peak services are as follows, in trains per hour (tph).
Southbound rail services
Northbound rail services
Rail replacement bus services
Along the line between Stafford and Stoke-on-Trent, many stations are in use, but not served by rail services. Instead, a rail replacement bus service operates to serve these stations.
A connecting service operates from Stone to Stoke city centre via Stoke-on-Trent Railway Station (the X1 service, operated by Bakerbus), departing every hour throughout the day on weekdays and Saturdays. This service calls at more stations along the line that is not served by any rail services, including Barlaston and Wedgwood.
No Sunday service operates on either bus routes.
Future services
Under current proposals for the future High Speed 2 line, the station would be served by 1 train per hour in each direction on the London Euston to Liverpool Lime Street route. These 'classic compatible' services would leave or join the West Coast Mainline at a new junction near Lichfield.
A proposal was made in 2008 as part of early investigations into a high-speed route for a new station just north of the town to be built with the proposed name was Stafford Parkway. Nothing further was heard of this proposal and it does not feature in the plans for High Speed 2 Phase Two.