Sredneuralskaya GRES – is an power plant of federal significance, GRES in Sredneuralsk city of Sverdlovsk region. It is a subsidiary of "Enel Russia". Total gross installed electrical capacity of Sredneuralskaya GRES is 1578,5 MW.
Contents
History
Sredneuralskaya GRES which has The Order of Lenin and The Order of the Red Banner of Labour, is situated at the Iset riverside. The first mention of the Srenderuralsk state region power plant was in "The plan of national economic construction of USSR" for the first five years. By the general "Plan of Ural electrification" the creation of "trunk feeder", which was based on 3 big region mains – Southern (Chelyabinsk), Northern (Gubakhino) and Sredneuralsk – was planned.
On 31 August 1930 Energocenter decided to build Sredneuralskaya GRES, which had to cover ural energy deficit. In October 1930 specialists, planers, geodesists and geologs from Leningrad appeared at the lakeside. The building of the station was started in 1931, on 6 January 1963 the first turbo generator installed capacity of 50 MW on Sredneuralskaya GRES was put in operation. In 1937 the second turbine was launched and in 1939 the third turbo aggregate was put in exploitation. During the Great Patriotic War the staff of Sredneuralskaya GRES saw off a quarter of workers. SUGRES supplied with the energy "Uralvagonzavod" where one third of all tanks, produced in USSR during the war, was constructed and also many other defense factories of Sverdlovsk region.
On 1 April 1945 г. Sredneuralskaya GRES was awarded by The Order of Lenin. On 17 April 1945 the collective of power plant got for eternal storage The Red Standard of State Committee of Defense. By 1949 the building of the first line of GRES with 234 MW: 8 boilers and 5 turbo aggregates, was finished.
During 1950–1953 on SUGRES for the first time in the state the coplex automation of heating processes was realized. The new sort of fuel – coal from Ekabastuz field- was mastered.
From 1962 the heat supply of two cities was started by 26 -km heat transport system SUGRES-Sverdlovsk that was unique in that period. From 1960 the building of the second line of SUGRES of 238 MW was started. That was the second born of the power plant. So, in 1960 powerful heating complex was come on stream on SUGRES, which provided Sverdlovsk, Verhnya Pishma and Sredneuralsk (with the total population more than one million people )with 1150 Gkal/hour of energy and 2000 tons of hot water per hour for the heat supply and hot water of. For improvement of Sverdlovsk heat supply by the end of 1966 the first line of electro station had been reconstructed: 3 turbines were transferred to heat supply and 2 boilers of 50 MW with 2 boilers of 200 tones/hour were demounted.
Because of increasing demands of energy in the regional center, in 1964 the enlargement of SUGRES was started. In 1967–1970 the third line with 900 MW capacity – 3 units of 300 MW was established. It included: turbines К-300-240 from Leningrad Metal Plant and boilers TGMP – 114 with capacity of 900 tones per hour.
In 1978 the power plant got the high rank of «The factory of communist labour».
In 1982 the first line of the power plant was transferred from carbon to natural gas, the reserve fuel – mazut.
In 1985 on SUGRES the complex of water preparation for replenishment of heating system with capacity of 6000 tons/hour was introduced. the water supply was operated through sluice from Volchihinskoe reservoir. Such filtering equipment had not been used previously in energy.
By the decree of 29 April 1986 of the presidium of Supreme Council of USSR. BSUGRES was awarded by the Order of Labor Red Banner for high technical and economical work of energy equipment.
More than once Sredneuralskaya GRES became the winner of social competitions. Totally there are 10 banners-relics on SUGRES, which were given to the collective for heroic work.
In 1993 the reconstruction of energy unit with capacity 300 MW with its transition to heating regime was implemented. It was the first such experience in Russia.
There was the introduction of gas turbine expansion station (GTES) with capacity of 11,5 thousands of KW in 2002 – new technological equipment, aimed to use energy of excess pressure.
The station partly supply with heat Yekaterinburg and its satellites. The main fuel is natural gas and the reserve fuel is mazut.
The main projects of Sredneuralskaya GRES are aimed at modernization of heating system of power plant's units.
Sredneuralskaya GRES is realizing 5 years-plan of stocking with fish Isetskoe reservoir. In 2014 by power plant's initiative more than 2 tons of precious species of fish were let out in this pond. From 2013 SUGRES has let out 6 tons of fish. While realization of the environmental events, Sredneuralskaya GRES and Reftinskaya GRESstarted the implementation of new technologies of lightening and energy efficiency: at the power plant lamps working on solar batteries were substituted instead of common street lamps.
Combined cycle gas turbine – 410
Today Sredneuralskaya GRES is a subsidiary of "Enel Russia". There are also Reftinskaya GRES (Sverdlovsk region), Konakovskaya GRES (Tver region) and Nevinnomysskaya GRES (Stavropol region) in "Enel Russia". In September 2008, in compliance of the Directive of the Government of the Russian Federation № 215р of 2008, Enel started construction of a new high-efficiency 410 MW combined cycle gas turbine. The construction of the turbine was completed in 2011.