Rahul Sharma (Editor)

Southern Company

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Type
  
Public

Founded
  
1945

Number of employees
  
26,112

Industry
  
Energy, Telecom

Area served
  
18 U.S. States

Southern Company httpsuploadwikimediaorgwikipediacommonsthu

Traded as
  
NYSE: SO DJUA component S&P 100 Component S&P 500 Component

Key people
  
Thomas A. Fanning, Chairman, President and Chief Executive Officer,

Stock price
  
SO (NYSE) US$ 50.30 -0.12 (-0.24%)27 Mar, 4:03 PM GMT-4 - Disclaimer

CEO
  
Thomas A. Fanning (1 Dec 2010–)

Headquarters
  
Atlanta, Georgia, United States

Subsidiaries
  
Georgia Power, Alabama Power

Profiles

2015 message to the southern company shareholders from ceo tom fanning


Southern Company is an American gas and electric utility holding company based in the southern United States. It is headquartered in Atlanta, Georgia, with executive offices also located in Birmingham, Alabama. The company is currently the second largest utility company in the U.S., in terms of customer base. Through its subsidiaries it serves 9 million gas and electric utility customers in nine states. Southern Company’s regulated regional electric utilities serve a 120,000-square-mile (310,000 km2) territory with 27,000 miles (43,000 km) of distribution lines.

Contents

Thomas sarkus southern company mississippi power s kemper igcc project


Overview

Southern Company is one of the largest energy providers in the United States and 162nd on the Fortune 500 listing of the largest U. S. corporations. It has more than 500,000 shareholders (NYSE: SO) and has been traded since September 30, 1949.

Southern Company subsidiaries are building the first new nuclear units in the U.S. in 30 years at Plant Vogtle near Augusta, Georgia; building a 21st-century coal facility in Kemper County, Mississippi; are operating or developing renewable solar, wind and biomass facilities across the U.S.

Four retail electric companies: Alabama Power, Georgia Power, Gulf Power, Mississippi Power, serve 120,000 square miles (310,000 km2) in four states. Southern Power serves wholesale electricity customers across the U.S. Southern Company Gas serves utility customers in seven states.

Southern Company owns the following companies:

  • Alabama Power - operating company, based in Birmingham. Serves the southern two-thirds of Alabama.
  • Georgia Power - operating company, based in Atlanta. Serves all of Georgia, except four mostly rural counties.
  • Gulf Power - operating company, based in Pensacola, Florida. Serves most of the Florida Panhandle.
  • Mississippi Power - operating company, based in Gulfport. Serves the Mississippi Gulf Coast.
  • Southern Company Services - (originally named Southern Services, Inc.) - Birmingham, Alabama - Common Services
  • Southern Linc - Cellular Telephone Provider - Atlanta, Georgia
  • Southern Nuclear - Engineering and Operations for Nuclear Power Plants - Birmingham, Alabama - (Southern Company is the majority owner and operator of the Farley, Hatch, and Vogtle nuclear power plants.)
  • Southern Company Generation - Fossil and Hydro Operations - Birmingham, Alabama
  • Southern Power - Wholesale Generation - Atlanta, Georgia
  • Southern Telecom - Wholesale Fiber Optic Communications and Data Services - Atlanta, Georgia
  • Southern Company Gas - Serves gas utility customers and operates natural gas pipelines - Atlanta, Georgia
  • PowerSecure - Distributed infrastructure technologies - Wake Forest, North Carolina
  • History

    Southern Company can be traced back to 1924, when Southeastern Power & Light was formed as a holding company for Alabama Traction, Light and Power (formed 1906), the immediate forerunner of Alabama Power. Later that year, it formed Mississippi Power as a subsidiary, with Gulf Power following in 1925. In 1926, it merged with Georgia Power (formed 1902). In 1930, Southeastern Power & Light merged into the Commonwealth & Southern Corporation. The new system included five Northern companies and six Southern companies. However, in the late 1940s Commonwealth & Southern was dissolved to meet the Public Utility Holding Company Act of 1935. Four of the Southern companies—Alabama Power, Georgia Power, Gulf Power, and Mississippi Power—were deemed to be an integrated system and thus were allowed to remain under common ownership. A new holding company, Southern Company was incorporated in Delaware on November 9, 1945, and moved to Georgia in 1950. The year 1949 saw Southern Company’s first full year of operation. In 1954–55, the company was involved in the Dixon-Yates contract with the Atomic Energy Commission, and the associated political controversy.

    In 1981, Southern Company became the first electric utility holding company in 46 years to diversify its operations by forming an unregulated subsidiary. In January 1982, Southern Energy, Inc., began official operations as a global energy company, growing to serve 10 countries on four continents. On April 2, 2001, Southern Company completed the spinoff of Southern Energy as Mirant Corporation.

    Another Southern Company subsidiary—Southern Nuclear—began providing services in 1991 to the system's nuclear power plants.

    In 1996, Southern Communications Services began providing digital wireless communications services to Southern Company's subsidiaries and also began marketing these services to the public within the Southeast as Southern Linc. Southern Telecom, a telecommunications subsidiary of Southern Company, was founded in 1997. Southern Telecom provides colocation and dark fiber optic lines to network businesses.

    On January 9, 2001, Southern Company received final approval from the Securities and Exchange Commission to form Southern Power, a subsidiary to own, manage and finance wholesale generating assets in the Southeast. The new subsidiary targets wholesale customers.

    On July 19, 2002, Southern Company Gas received certification from the Georgia Public Service Commission to enter the retail gas market. After nearly four years of operations, the company was sold and customers transferred to Cobb EMC's newly formed affiliate, Gas South.

    In 2016, Southern Company acquired PowerSecure, a distributed energy infrastructure technologies company, and AGL Resources (which was renamed Southern Company Gas). As a result of the AGL Resources merger, Southern Company doubled its customer base, expanded its footprint and broadened the scope of its business by increasing its natural gas presence.

    Plant Vogtle

    Southern Company subsidiaries operate hydroelectric, gas, coal, and nuclear generation sources to generate approximately 200 terawatt-hours of electricity. In 2009, coal represented 57 percent of the company's output, followed by nuclear (23%) and natural gas (16%). Renewable hydroelectric power represented 4 percent of Southern's generation. Coal-based generation dropped significantly in 2009 from an average of 70% between 2005 and 2008.

    In June 2010, the United States Department of Energy awarded an $8.3 billion loan guarantee to facilitate the construction of two new nuclear reactors at Plant Vogtle, near Augusta, Georgia. A Southern Company subsidiary, Georgia Power, owns 45.7% of the current 2,430 MW facility, with co-owners Oglethorpe Power (30%) Municipal Electric Authority of Georgia (22.7%) and the City of Dalton (1.6%). The plant is operated by Georgia Power. The $14 billion construction project is scheduled to be completed by 2016 and would double the plant's capacity.

    The construction of two 1,154 MW reactors has been hailed by Energy Secretary Steven Chu as "the first new nuclear power plant to break ground in decades". It is expected to create up to 3,500 jobs during the construction phase, and 800 once operational.

    Plant Ratcliffe

    In September 2013 the EPA introduced new provisions regarding output of carbon emissions in new power facilities. The proposed emission limit for new energy sources will be 1,100lbs of carbon dioxide per megawatt hour of electricity. Preemptively recognizing the need for these changes, Southern Company broke ground on its 21st-century clean coal facility in June 2010. Southern’s subsidiary, Mississippi Power will operate the plant. The Kemper County Energy Facility, or Kemper Project, takes advantage of the abundant lignite, or poor quality coal, available in Mississippi. Additionally, it employs Transport Gasifier (TRIG) technology. TRIG technology is built on the idea of dry-feed, non-slag gasifiers, which operate at lower temperatures than other coal gasifiers. This dry-feed is crushed, heated, and circulated in the gasifier, producing a flammable synthetic gas, syngas. Syngas can generate electricity with fewer emissions. Of course, other byproducts are produced, like ammonia and sulphuric acid. These particular products are sold for commercial use.

    The EPA considers the Kemper Coal Project and other planned facilities like it, to be a lifeline for the coal industry in the wake of the new climate change plan. Between 2010 and 2014, approximately 150 coal plants were shut down.

    As of April 2014, the US Department of Energy had invested $270m in this project. Southern Company, and its subsidiary, Mississippi Power anticipate that the Kemper Coal Plant will generate enough energy to serve more than 187,000 customers. Upon opening, the Kemper Coal Project is expected to be capable of stripping out at least 65% of the carbon dioxide, significantly exceeding the EPA’s proposed requirement of 40%.

    Partnerships

    Southern Company works closely with the US Department of Energy on a variety of projects including transmission and distribution of infrastructure and smart grid initiatives, environmental research programs, and nuclear generation. One of the more significant joint efforts, the DOE’s National Carbon Capture Center, is managed by Southern Company and represents national efforts to reduce greenhouse gas emissions from coal-based power generation. At this location, Southern Company has been working with scientists and technology developers from government, industry, and universities who are creating the next generation of carbon capture technologies.

    Along with the DOE, Southern Company has been working with KBR, another technology partner, to perfect its TRIG advanced coal gasification technology. This process of breaking down “dirty coal”, or lignite, into its chemical components is not only cleaner, but it’s also less expensive and more reliable. This technology is currently being implemented at Southern Company’s Kemper County power plant, one of the few new coal facilities working to keep the US coal industry alive. This new facility will be built on a lignite seam, is expected to strip out two-thirds of carbon dioxide emissions, leaving emissions at about the same level as natural gas. The Kemper Coal Plant is expected to fall well under new regulations implemented by the EPA, which limits coal plants to 1,100lbs of carbon dioxide emissions per megawatt hour of electricity.

    In an effort to make this technology more attainable, Southern Company has partnered with China’s Shenhua Group to collaborate on further research, development, and deployment of clean coal technologies in the US, China, and around the world. This partnership with Shenhua, who is currently expected to add more than 400,000 megawatts of coal-fired capacity by 2035, could lead to wide deployment of TRIG-equipped power plants across Asia. TRIG technology has the potential to not only assist China with their growing carbon issue, but also enable the country to tap into their own low quality coal.

    Kemper Project Controversies

    In February 2015, the Mississippi Supreme Court ruled Southern Company's subsidiary Mississippi Power must refund 186,000 South Mississippi ratepayers for rate increases related to the Kemper Project. These fees are derived from Mississippi's Baseload Act, allowing Mississippi Power to charge ratepayers for powerplants under construction.

    In May 2016, Southern Company and its subsidiary Mississippi Power announced they were being investigated by the Securities and Exchange Commission related to overruns at the Kemper Project. The project had been repeatedly delayed and costs increased from $2.88 billion to $6.58 billion.

    In June 2016, Mississippi Power was sued by Treetop Midstream Services over the cancelation a contract to receive carbon dioxide from the Kemper Project as part of the carbon capture and storage design. Treetop had contracted to buy carbon dioxide from the Kemper plant and had built a pipeline in preparation to receive the gas. Treetop alleged Mississippi Power had fraudulently and "intentionally misrepresenting and concealing the start date" for the Kemper Project, though Mississippi Power stated the suit was without merit.

    The company was also found to have unlawfully fired a whistle-blower who had criticized alleged false statements by company management.

    Environmental concerns

    As a coal-burning energy company, greenhouse gas emissions are a primary environmental concern. According to a 2007 study conducted by the Center for Global Development, the Southern Company is the largest greenhouse gas emitter in the U.S. utility industry, with an annual tally of 172 million tonnes of carbon dioxide equivalent gases.

    In response to growing public and financial community interest the company has enacted both corrective and palliative environmental measures.

    Corrective measures

    The company recently opened the Plant Crist Test Center in Pensacola, Florida, where they hope to discover new ways to reduce mercury emissions.

    Additionally, the company has developed TRIG advanced coal gasification technology which turns coal into gas that can be used to generate electricity with less emissions than traditional coal-fired power plants. Southern Company’s Kemper Project in Mississippi will be the only Integrated gasification combined cycle (IGCC) plant in the U.S. that will capture and store carbon dioxide emissions from commercial operations starting in 2014.

    Palliative measures

    Southern Company is building one of the largest all-biomass plants in the nation. The company expects the 100-megawatt Nacogdoches Generating Facility to serve the city of Austin for 20 years.

    In partnership with Turner Renewable Energy, the company is building one of the largest solar photovoltaic plants in the U.S. near Cimarron, New Mexico. The 30-megawatt project will supply power to approximately 9,000 homes.

    The company manages and operates the National Carbon Capture Center, a focal point of U.S. Department of Energy's efforts to develop carbon capture and greenhouse gas reduction technologies, under which various projects to test geologic sequestration are in progress at Plant Gorgas in Alabama, Plant Daniel in Mississippi and other company sites.

    Southern Company participates in Renew Our Rivers, a volunteer program to remove debris from rivers and other waterways throughout the Southeast, which claims over 11 million pounds of trash removed or recycled in Renew Our Rivers events.

    Impact

    Coal-burning (whether direct or via gasification) energy production continues to be an environmental concern, and Southern Company continues to produce large amounts of greenhouse gas emissions as part of its day-to-day operations.

    References

    Southern Company Wikipedia