Trisha Shetty (Editor)

Smithland Lock and Dam

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Opening date
  
1980

Length
  
899 m

Impound
  
Ohio River

Impounds
  
Ohio River

Construction began
  
1971

Smithland Lock and Dam waterweathergovahps2imageshydrographphotoss

Location
  
Kentucky/Illinois border

Operator(s)
  
United States Army Corps of Engineers Louisville District

Type of dam
  
Concrete fixed weir with 11 Tainter gates

Normal elevation
  
324 feet above sealevel

Similar
  
Ohio River, Lock and Dam Number 52, Newburgh Lock and Dam, Lock and Dam Number 53, Cannelton Locks and Dam

Smithland Lock and Dam is the 18th Lock and dam on the Ohio River, 919 miles down stream of Pittsburgh and 63 miles upstream from the confluence of the Mississippi with the Ohio. There are 2 locks for commercial barge traffic that are 1,200 feet long by 110 feet wide.

Contents

Map of Smithland Lock and Dam, Smithland, KY 42081, USA

History

Smithland lock and dam was authorized in 1965 to replace lock and dam 50 and 51 on the Ohio river.

References

Smithland Lock and Dam Wikipedia