Girish Mahajan (Editor)

Sheppey Crossing

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Design
  
beam bridge

Longest span
  
92.5m

Total length
  
1,250 m

Body of water
  
The Swale

Width
  
21 metres (70 feet)

Opened
  
3 July 2006

Bridge type
  
Beam bridge

Location
  
Kent, Isle of Sheppey

Sheppey Crossing wwwsteelconstructioninfoimagesthumb11fShepp

Carries
  
Four lane dual carriageway highway

Crosses
  
The Swale (a strait in the North Sea)

Locale
  
Isle of Sheppey, Kent, England

Architecture firms
  
Capita Property and Infrastructure, Cass Hayward LLP, Yee Associates

Similar
  
Kingsferry Bridge, Swale railway station, Ridham Dock, Teston Bridge, Saxon Shore Way

The Sheppey Crossing is a bridge which carries the A249 road across The Swale (a strait in the North Sea), linking the Isle of Sheppey with mainland of Kent. The four-lane crossing measures 21.5 m (71 feet) in width, at a height of 35 m (115 feet) over the water. The A249 links the M20 and M2 motorways to Sheppey. The bridge opened in 2006, and it provides an alternative highway to the neighbouring Kingsferry Bridge that was completed in 1959.

Contents

Map of Sheppey Crossing, Sittingbourne ME9 8SS, UK

The Sheppey Crossing is not open to pedestrians, bicycles, or horses, and these continue to use the older bridge, as does the railway line to Sheerness. Both bridges are monitored by an automatic number plate recognition (ANPR) system to detect lawbreaking vehicles.

Construction

The bridge was constructed as part of a £100 million plan to improve the A249 between the M2 and the port of Sheerness. The Kingsferry Bridge, which previously carried the A249, suffers from two major drawbacks: It has only one lane in each direction and as traffic to and from the island increased over time it became a bottleneck. Secondly, it is a vertical-lift bridge. It needs to be raised regularly to allow marine traffic to pass under it, leading to lengthy traffic delays. Before its opening, it was estimated that 26,000 vehicles a day would use the new crossing.

The bridge was designed by Cass Hayward and Capita Symonds, and won the 2007 IStructE Award for Transportation Structures. Around 10,000 tonnes of steel was used in construction, which was carried out by Carillion under a private finance initiative contract, was made more difficult because many of the bridge's piers had to be built on marshland. A jacking mechanism was employed to move the sections of roadway into position from each end of the bridge, with the final two sections of deck (piers 7 and 8 and piers 15, 16, and 17) lifted into place during November 2005.

The bridge was opened on 3 July 2006, by the Minister of Transport, Stephen Ladyman. A competition held to name the new bridge was won by lifelong Sheppey resident Reginald Grimwade, who was then invited to attend the opening ceremony and presented with an award by Ladyman.

Notable incidents

On the morning of 5 September 2013, more than 130 vehicles were involved in a series of shunt crashes on the southbound carriageway of the crossing which at the time was covered in heavy fog. Emergency services were called to the crossing at around 07:15 BST according to Kent Police and the bridge was subsequently closed for nine hours. Inappropriate driving in conditions of very poor visibility was suggested as the cause. There were eight serious injuries and 60 minor injuries, but no life-threatening injuries or deaths.

Following the incident, questions were raised over the safety of the unlit bridge with calls for speed restrictions and overhead lights. The AA suggested matrix warning signs "as a minimum".

References

Sheppey Crossing Wikipedia