Puneet Varma (Editor)

Severn Beach railway station

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Place
  
Severn Beach

Station code
  
SVB

DfT category
  
F1

Opened
  
1874

Number of platforms
  
1

Grid reference
  
ST540847

Managed by
  
Great Western Railway

2011/12
  
0.142 million

Local authority
  
South Gloucestershire

Original company
  
Great Western Railway

Severn Beach railway station

Address
  
Severn Beach, Bristol BS35 4PL, United Kingdom

Similar
  
Avonmouth railway station, Shirehampton railway station, St Andrews Road railway st, Redland railway station, Montpelier railway station

Severn Beach railway station serves the village of Severn Beach, England. This is the terminus of the Severn Beach Line.

Contents

This station is 13.5 miles (21.7 km) north west from Bristol Temple Meads on the Severn Beach Line. The station is managed by Great Western Railway, who are also the sole provider of trains serving the station.

History

The railway reached Severn Beach in 1900, but was at first used only for goods traffic to Pilning. A platform was built beside the line at Severn Beach by the Great Western Railway in 1922, and a bay platform added to the west for excursion traffic, with terminating passenger services from Bristol starting on 26 May 1924, subsequently extended to Pilning in a loop back to Bristol via Patchway from 9 July 1928. By 1924 a brick concourse had been built perpendicular to the bay platform, providing a ticket office, the station master's office, toilets and a ladies' waiting room. The station master and keeper of the level crossing were also provided with houses, while to the east of the platform were sidings, primarily for stabling of excursion trains.

In November 1964 through services to Pilning ceased, with the line north closed completely in July 1968, although goods traffic at Severn Beach had already ended in 1963.

More recently, services to Severn Beach have been cut back further, with only one in three trains to Avonmouth now continuing on to Severn Beach. The concourse and other station buildings have been demolished, replaced with a small metal and glass shelter, while the eastern rails have been pulled up, leaving just the bay platform remaining. Half of the 240 yards (220 m) is cordoned off, and that which remains dwarfs the two-car diesel multiple units which use it. To the east, the land once used for sidings has become overgrown and a dumping ground for litter and general detritus.

Service

Services at Severn Beach are all terminating services from Bristol Temple Meads, operated by Great Western Railway using mainly Class 150 Sprinter units. Monday to Friday, three trains every two hours run from Temple Meads to Avonmouth, with one extended to St Andrew's Road and Severn Beach, giving a service roughly every two hours, the first arriving around 6am and the last departing Severn Beach about 11pm. On Saturdays more trains continue, with either a replacement bus service or train each hour, with more trains in the evening.

Sunday sees an hourly service in the summer months (May to mid-September), but just two departures in the winter (most services terminating at Avonmouth)

Future

Great Western Railway declined a contractual option to continue the Greater Western passenger franchise (of which services at Severn Beach are a part) beyond 2013, citing a desire for a longer-term contract due to the impending upgrade to the Great Western Main Line. The franchise was put out to tender, but the process was halted and later scrapped due to the fallout from the collapse of the InterCity West Coast franchise competition. A two-year franchise extension until September 2015 was agreed in October 2013, and subsequently extended until March 2019.

With the coming upgrade to the Great Western Main Line, the main line from London to Bristol is due to be electrified by 2016. However, the electrification will not extend beyond the main lines, so Severn Beach will continue to be served by diesel trains. Stephen Williams, MP for Bristol West, questioned whether electrification could continue to Clifton Down. Then-Secretary of State for Transport Philip Hammond replied that it would have to be looked at in the future. The group Friends of Suburban Bristol Railways supports the electrification of the entire Severn Beach Line.

Improved services at Severn Beach are called for as part of the Greater Bristol Metro scheme, a rail transport plan which aims to enhance transport capacity in the Bristol area. There is an aspiration for half-hourly services, however due to the large sections of the Severn Beach Line which are single-track and to the congested main line from Temple Meads, such frequency is not currently feasible. The scheme was given the go-ahead in July 2012 as part of the City Deal, whereby local councils would be given greater control over money by the government.

References

Severn Beach railway station Wikipedia