Status Operational Installed capacity 560 MW | Location Central Armenia Opening date 1962 Owner RusHydro Construction began 1936 | |
![]() | ||
Operator(s) International Energy Corporation Similar Hrazdan Thermal Power Pl, Vorotan Cascade, Bureya Dam, Ust‑Ilimsk Hydroelectric Power St, Lake Sevan |
Sevan–Hrazdan Cascade (Armenian: Սևան-Հրազդան Կասկադ) is a complex of hydroelectric power plants on the Hrazdan River and its tributaries between the Lake Sevan and Yerevan in Armenia. They use irrigation water flow from the Lake Sevan and streams waters of Hrazdan River that gives an opportunity to irrigate 70% of Armenian agricultural lands. The cascade is owned by the International Energy Corporation (IEC), a subsidiary of RusHydro.
Contents
- Map of Atarbekyan Hydro Power Plant Hrazdan Armenia
- History
- Technical description
- Power plants
- Sevan HPP
- Hrazdan HPP
- Argel HPP
- Arzni HPP
- Kanaker HPP
- Yerevan 1 HPP
- Yerevan 3 HPP
- Rehabilitation project
- References
Map of Atarbekyan Hydro Power Plant, Hrazdan, Armenia
History
The first small-scale Yerevan HPP was built in 1923. In 1932, it was replaced by Yerevan-2 HPP. The construction of the current cascade started in 1936, when the Kanaker HPP was opened. That time it was planned to built the whole cascade by 1947. In 1940, construction of the Sevan HPP started but due to World War II, construction was suspended and the HPP became operational only in 1949. The largest HPP, Argel HPP, was opened in 1953, followed by Arzni HPP in 1953, Yerevan-3 HPP in 1955, Hrazdan HPP in 1959 and Yerevan-1 HPP in 1962. The original plan included also construction of three more HPPs—Upper Argavand HPP, Lower Argavand HPP and Noragavit HPP—but these plants were never built.
In 2003 the cascade was given to Inter RAO UES in return for US$25 million debt by Armenia. For operation of the cascade, the IEC was incorporated. In 2011, Rushydro bought the IEC from Inter RAO. In November 2015 it was published that Rushydro plans to sell the IEC.
Technical description
The length of the Sevan–Hrazdan Cascade is about 70 kilometres (43 mi) and it consists of seven hydroelectric power plants (HPP), with total nominal capacity of 565 MW. The HPPs are Sevan, Hrazdan, Argel, Arzni, Kanaker, Yerevan-1 and Yerevan-3—all run-of-the-river type. The cascade produces about 10% of Armenia's electricity.
The operation of the Sevan–Hrazdan Cascade is dependent on amount of water supply from the Lake Sevan and it is suitable for the daily peak generation. Five HPPs operate all year long and two HPPs work only during the irrigation season when additional water is available in the system. Therefore the power generation during the winter is limited.
The water is transported from the Lake Seven to the HPPs through open diversion canals and tunnels. Most of these canals were built in 1960s and are now under poor conditions and require rehabilitation.
Power plants
Source: IEC, Asbarez
Sevan HPP
The Sevan HPP, also known as the Lake HPP, is the upper power station of the cascade. It is an underground power station locating 100 metres (330 ft) below the surface. It has two turbines with a total nominal capacity of 34.2 MW and the factual capacity of about 24 MW. Its nominal annual generation is 130 GWh, but the factual generation for the last years has been about 15 GWh. The water intake of the Sevan HPP was renovated in 2010.
Hrazdan HPP
The Hrazdan HPP, also known as Atarbekyan HPP, is located in between Sevan HPP and Argel HPP. It has two turbines with a total installed capacity of 81.6 MW. Its nominal annual generation is 375 GWh, but the factual generation for the last years has been about 40 GWh.
Argel HPP
The Argel HPP, also known as Gyumush HPP, is located in between Argel HPP and Arzni HPP. It is the largest power plant of the cascade. It has four turbines, supplied by LMZ, with total installed nominal capacity of 224 MW and available capacity about 168 MW. Its nominal annual generation is 870 GWh, but the factual generation for the last years has been about 200 GWh. The plant is important for ensuring the frequency of the Armenian power system, ensuring the emergency supply to the Metsamor Nuclear Power Plant, and supplying peak-load capacity.
In May 1995, landslides caused by heavy rains destroyed one of the plant spillways and blocked the Hrazdan River channel. It was restored and reopened in 2000 and 2006 correspondingly.
Arzni HPP
The Arzni HPP is located in between of the Argel HPP and the Kanaker HPP. It has three turbines with total installed capacity of 70.6 MW. Its nominal annual generation is 300 GWh, but the factual generation for the last years has been about 80 GWh.
Kanaker HPP
The Kanaker HPP is located next to the Rusal Armenal aluminum smelter in Kanaker in between of the Arzni HPP and the Yerevan-1 HPP. It has a total installed capacity of 100 MW which consists of four turbines with capacity of 12.5 MW each and two turbines with capacity of 25 MW each, all supplied by LMZ. The nomibal installed capacity is !00 MW and the factual capacity is 87.5 MW. Its nominal annual generation is 425 GWh, but the factual generation for the last years has been about 110 GWh. The plant is important for providing the peak-load capacity as also supplying Yerevan with irrigation and industrial water.
The plant was rehabilitated in 1993–1995, a project financed by USAID, Energy pour l’Armenie and Aznavour pour l’Armenie. In 1995, the unit 5 and in 2000, the unit 6 were shut for the renovation, financed by the loan from KfW. These units were reopened in 2003. The renovation was carried out by Alstom Power Generation.
Yerevan-1 HPP
The Yerevan-1 HPP is located in between Kanaker HPP and Yerevan-3 HPP in the center of Yerevan. It has two turbines with the total installed nominal capacity of 44 MW and available capacity of 22 MW. Its nominal annual generation is 210 GWh, but the factual generation for the last years has been about 50 GWh. It supplies the center part of Yerevan.
Yerevan-3 HPP
The Yerevan-3 HPP is located in Yerevan. It has one turbined with installed capacity of 5 MW. Its diversion channel and penstock are part of the Artashat irrigation channel.
Rehabilitation project
Most part of the Sevan–Hrazdan Cascade is in bad condition. Since its establishment there had not been held any big repairs. There is a rehabilitation project going on the Sevan–Hrazdan Cascade that is predicted to be completed in 2017. The main goal of the rehabilitation project is to re-establish the initial capacity of the cascade. The planned works for the rehabilitation project include a complete reconstruction of Yerevan-1 HPP. Sevan HPP, Hrazdan HPP, Argel HPP, Arzni HPP, and Kanaker HPP will have a new electrical equipment, such as new accumulators and generators. Also the hydro units of Argel HPP, Hrazdan HPP and Kanaker HPP will be replaced.
As there is a plan to dredge Yerevan-1 dam right on the biological environment—there is also a high-level risk because of increased turbidity. Another negative impact may be expected due to works and equipment transportations, which would cause pollution and noise, resulting in a social indignation. The rehabilitation process will not include any further expansion or creation of new facilities—all the work items are approved according to the plan.