Commission date 1976 (1976) Construction cost 1.2 billion SGD Units operational 9 | Status Operational Phone +65 6750 0000 | |
![]() | ||
Owner(s) Lion Power Holdings (Senoko Energy) Address 31 Senoko Rd, Singapore 758103 Similar Pulau Bukom, Sembawang MRT Station, Pulau Semakau, Defence Technology Tower B, Saint John's Island |
The Senoko Power Station is the largest power station in Singapore. It is located in Senoko, Sembawang and was commissioned in 1976. It is owned by Senoko Energy Pte Ltd, formerly known as Senoko Power Ltd.
Contents
Description
The Steam Plant Stage I, which was completed in 1976, comprised three steam thermal plants with 120 MW of capacity each.
The Steam Plant Stage II, which was completed in 1979, comprised three steam thermal plants with 250 MW of capacity each.
The Steam Plant Stage III which was completed in 1983 comprises another two steam thermal plants with 250 MW of capacity each. In 1992, Stage III 250 MW boilers were modified with gas burners to enable it to fire both Natural Gas and Fuel Oil.
The combined cycle plants include combined cycle plants 1 and 2, combined cycle plants 3 to 5 and combined cycle plants 6 and 7.
The Gas Plant Stage I was an open cycle plant with 4 open cycle gas turbines with 131 MW capacity when commissioned in 1991. In 1994, the 4 open cycle gas turbines were converted into two blocks of combined cycle plants with 425 MW of capacity each and renamed CCP 1 and 2. In 2010, Gas Turbine GT22 of CCP 2 was upgraded with new vanes and blades for its stage 1 and 2
The combined cycle plants 3 to 5 were completed and fully operational by 2004 with 365 MW of capacity each, which involved the repowering of the Stage I oil-fired steam thermal plant.
The combined cycle plants 6 and 7 were completed and commissioned by 2012 with 431 MW of capacity each, which involved the repowering of the Stage II oil-fired steam thermal plant.
In its early years, the plant used crude oil as fuel to power its turbines; however, this was replaced by natural gas piped from Terengganu on the east coast of Peninsular Malaysia after 1992. Oil, however, is still used as a back-up.
In 1992, a fire broke out at one of its plants resulting in a major power outage in the island.
Based on a mutual agreement between Malaysia and Singapore on electricity, the plant is linked by a submarine cable to the Sultan Iskandar Power Station in Pasir Gudang, Johor. In the event of a power outage in Peninsular Malaysia, the plant would supply electricity to the Johor plant. Likewise, if there is a power outage in Singapore, the Johor plant would supply electricity to Senoko.
The plant's only standing concrete chimney which belongs to Stage 3, at 182 metres high, is the tallest structure in the northern part of Singapore and one of the tallest structures on the island. It is clearly visible across the Tebrau Straits and in most parts of Johor Bahru. The plant's second chimney which belongs to Stage 2 was demolished in July 2010 as part of the repowering process.
Sell-off
On September 5, 2008, Temasek Holdings sold Senoko Power to Lion Power Holdings for S$3.65 billion. Lion Power is owned by a consortium led by Japan's Marubeni Corporation. Other members of the consortium are GDF Suez of France, The Kansai Electric Power Company, Kyūshū Electric Power Company and Japan Bank for International Cooperation.