Suvarna Garge (Editor)

Seattle Center Monorail

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Type
  
Straddle-beam monorail

Daily ridership
  
7,000

Opened
  
March 24, 1962

Electrification
  
Third rail

Stations
  
2

Status
  
Operational

Designated
  
August 4, 2003

Owner
  
City of Seattle

Locale
  
Downtown Seattle

Seattle Center Monorail Home Seattle Center MonorailSeattle Monorail

Terminis
  
Westlake Center (east), Seattle Center (west)

Ride the monorail through seattle seattle center monorail cousin of disney monorails


The Seattle Center Monorail is an elevated monorail line in Seattle, Washington, that operates along Fifth Avenue between Seattle Center in Lower Queen Anne and Westlake Center in Downtown. Seattle Center Monorail is a public transit route with a top speed of 45 mph (72 km/h). Owned by the City of Seattle, the line has been operated by private contractor Seattle Monorail Services since 1994. It was given historical landmark status by the Seattle Landmarks Preservation Board April 16, 2003.

Contents

Seattle Center Monorail About the Monorail Seattle Center MonorailSeattle Monorail

Seattle center monorail fun facts video


Creation and route

Seattle Center Monorail Home Seattle Center MonorailSeattle Monorail

The monorail, which cost $3.5 million to build, opened on March 24, 1962 for the Century 21 Exposition, a World's Fair held at the current site of Seattle Center. Eight million people rode the monorail during the half year the fair was open; today, annual ridership is around 2 million. The line and its trains were built by Alweg Rapid Transit Systems.

Seattle Center Monorail Seattle Monorail A Million Cool Things to Do Seattle

Originally, the south end of the line was a large station over Pine Street at Westlake Avenue that formed a lid over the street and a portion of Westlake Park. In 1988, the station was moved north a block with the construction of the Westlake Center shopping mall on what had been the right-of-way of Westlake Avenue.

Seattle Center Monorail seattlecentermonorailfileswordpresscom201010

The Westlake station of the monorail has an elevator down to the Westlake Station of the Downtown Seattle Transit Tunnel, a stop for the Central Link light rail line, and major Metro bus lines. Westlake Center is also near the southern terminus of the South Lake Union Streetcar and numerous surface bus routes.

Seattle Center Monorail Monorail Getting Around Seattle Seattle MonorailSeattle Monorail

At the northern end of the line, the Museum of Pop Culture building was designed so that the monorail passes through it on its way to the terminal.

Operations

Seattle Center Monorail 1000 images about Monorail on Pinterest Blue train Travel and

The Seattle Center Monorail is operated by a private contractor, Seattle Monorail Services (SMS), which took over operation from the City in June 1994. Operating profits, which can be as much as $750,000 per year, are split between the City and SMS.

Service operates daily, and trains depart every 10 minutes from the station at Seattle Center en route to Westlake Center Mall, at Fifth and Pine Street. Each trip takes two minutes to cover the approximately one-mile route. Every train can carry up to 450 passengers per trip. The monorail provides two-train service during special events and activities, with departures every five minutes or less.

One-way fares are $2.25 for adults, $1.00 for youths aged 5–12, and $1.00 for reduced rate, including seniors citizens 65 years and older, disabled individuals, persons with Medicare cards, and active-duty U.S. military carrying their identification cards. Roundtrip fares are twice the price of a one-way fare, while children four and under ride free.

Technical details

The line consists of two parallel tracks with one train riding each track.

The fleet consists of two trains constructed by Alweg in 1961. These original trains are still in service and have served the line since its opening in 1962.

Each train is powered by four 750 Hp DC Motors running at 700V and typically drawing up to 700 amps. The motors are controlled by a mechanical motor controller that adjusts the position of the motors and number of resistors in the circuit. The motors run into a standard truck differential, with one side blocked off and the other running to the driving wheel, which runs a standard truck tire.

The electric current is drawn from a two-tiered electric rail that is aligned with the side of the track. The top rail is ground, with the live rail suspended beneath it.

The monorail uses dynamic braking for higher speed braking (over 10 mph), and has drum brakes for lower speeds.

Accidents

On July 25, 1971, a brake failure on the red train resulted in it striking the girder at the end of the track in the Seattle Center station, causing injuries to 26 passengers.

On May 31, 2004, a fire broke out on the monorail with 150 people aboard. Five passengers were taken to the hospital with minor injuries.

On November 26, 2005, the two trains clipped one another on a curve, shearing a door off one train. Two people were hospitalized with minor injuries. Poor design and driver error were blamed for the crash; in 1988, the space between the monorail tracks had been reduced at the southern end of the line to make room for the new Westlake Center, effectively making gauntlet/interlaced track.

References

Seattle Center Monorail Wikipedia