Rahul Sharma (Editor)

Sarmiento Line

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Status
  
Active

Ridership
  
39,664,000 (2014)

Stops
  
40

Start
  
Once railway station

Former operator
  
Trenes de Buenos Aires

Locale
  
Buenos Aires Province

Website
  
Sarmiento Line

Distance travelled
  
174 km

First service
  
1948

Service type
  
Commuter rail

Sarmiento Line httpsuploadwikimediaorgwikipediacommonsthu

Current operator
  
Operadora Ferroviaria Sociedad del Estado

Predecessor
  
Buenos Aires Western Railway

Ends
  
Moreno, Buenos Aires, Lobos, Mercedes

Los canarios capitulo 2 sarmiento line


The Sarmiento line is a broad gauge commuter rail service in Buenos Aires Province, Argentina, run by the state-owned Trenes Argentinos since 11 Sep 2013.

Contents

Ferrocarril tren sarmiento sarmiento line train railway buenos aires argentina hd


History

This line had previously been run by the state-owned company Ferrocarriles Argentinos since nationalisation of the Argentine railways in 1948. FA operated the trains until 1991 when residual company FEMESA temporarily took over all the urban services prior to be privatized. After the Government of Carlos Menem privatized the urban railways services private company Trenes de Buenos Aires (TBA) took over Mitre Line.

TBA operated the line until the 2012 Once station rail disaster happened. As a result, the National Government revoked the concession granted to TBA and gave the Mitre and Sarmiento to UGOMS, that operated the line until 2014 when it was re-privatised and given under concession to "Corredores Ferroviarios S.A."

In 2014 the Government announced the acquisition of new trains to replace the existing Sarmiento Line rolling stock. The cars were manufactured by Chinese company CSR Corporation Limited, with the first arriving in June 2014. The incorporation of the rolling stock was also accompanied by the replacement of rails between Once and Moreno.

During 2015 a series of improvement works were conducted and completed on the line. These included remodelling stations, new signaling and other infrastructure improvements such as replacing track and third rail segments, as well as the refurbishing of workshops. The works, which also included the installation of a communications-based train control system, meant that the line was closed on Sundays from February to June of that year on its electrified segment, with replacement bus services operating during that time.

Tunnels

The line has two underground segments not currently in use for passenger services. The first of these is an underground station within the Plaza Miserere Buenos Aires Underground station, which formerly provided a direct connection with Line A alongside its platforms, rather than passengers transferring from Once railway station to the line using underground passages. In May 2014, this connection was being restored with tracks replaced in order to restore the line's service to the Underground.

The second is a tunnel which runs directly from Once railway station to Puerto Madero in the centre of the city. Today this is only used for freight to the Port of Buenos Aires, however it was briefly used for passenger services in the 1990s. The tunnel is around 5 km long and runs through the middle of the city below Line A. Construction of the tunnel had been initiated by the Buenos Aires Western Railway in 1912, however it was not completed until 1916 due to delays caused by the First World War. The restoration of this tunnel is currently under way according to SOFSE, however it is unclear if it will be used for passenger services or continued to be used for freight.

Sarmiento tunnelling

The performance of the Sarmiento line will be greatly improved by drilling a new tunnel. Under plans announced in 2006, a 33 km tunnel is to be bored between Moreno and Caballito in order to replace the surface alignment of the Sarmiento commuter route. According to the Minister of the Interior and Transport, the first stage will cost 11.5 billion pesos, removing many level crossings which would "avoid many accidents and much loss of life." The new underground alignment should increase the service frequency to every 3 min, increasing capacity from 100 million to 280 million passenger-journeys a year. The tunnel segment will have 13 underground stations. Drilling started 2 July 2012. During the construction, service on the surface line will continue.

References

Sarmiento Line Wikipedia