Harman Patil (Editor)

Rutshuru Hydroelectric Power Station

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Location
  
Rutshuru, North Kivu

Impounds
  
Rutshuru River

Commission date
  
December 16, 2015

Turbine
  
2

Status
  
Operational

Normal elevation
  
1,600 m (5,200 ft)

Impound
  
Rutshuru River

Rutshuru Hydroelectric Power Station

Country
  
Democratic Republic of the Congo

Rutshuru Hydroelectric Power Station, also referred to as Rutshuru Hydropower Station, is a 13.8-megawatt (18,500 hp) hydroelectric power station under construction in the Democratic Republic of the Congo. The plant was finished in December 16, 2015.

Contents

Location

The power station is located near the town of Rutshuru, in Rutshuru Territory, North Kivu Province, in eastern Democratic Republic of the Congo. This location lies at an altitude of about 1,600 metres (5,200 ft), on Rutshuru River, in the Virunga Mountains, close to the International borders with the Republic of Uganda and the Republic of Rwanda. Rutshuru lies approximately 75 kilometres (47 mi), by road, north of Goma, the location of the provincial capital.

Overview

Rutshuru Power Station is a run of river, mini-hydropower plant, with planned installed capacity of 12.5 Megawatts. It is one of three mini-hydropower stations planned for construction in Virunga National Park, in North Kivu, in eastern DRC. The other two mini hydropower stations are the planned Lubero Hydroelectric Power Station, and Mutwanga Hydroelectric Power Station, which was commissioned in August 2013.

Construction costs

The Howard G Buffett Foundation, an American philanthropic organization, which provided technical and financial support from the beginning of the project, has committed another US$19.7 million towards the completion of the Rutshuru Hydropower Station. Construction began in December 2013 and commissioning is expected in 2016.

References

Rutshuru Hydroelectric Power Station Wikipedia