Suvarna Garge (Editor)

Rhyd Ddu railway station

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Place
  
Rhyd Ddu

Grid reference
  
SH571525

Owner
  
Ffestiniog Railway

Area
  
Gwynedd

Managed by
  
Welsh Highland Railway

Platforms in use
  
2

Rhyd Ddu railway station httpsuploadwikimediaorgwikipediacommonsthu

Original company
  
North Wales Narrow Gauge Railways

Owned by
  
Festiniog Railway Company

Similar
  
Snowdon Ranger railway st, Plas‑y‑Nant railway station, Beddgelert railway station, Pont Croesor railway st, Ffestiniog Railway

Rhyd Ddu is a station on the narrow gauge Welsh Highland Railway, which was built in 1881 as the North Wales Narrow Gauge Railways Moel Tryfan Undertaking to carry dressed slate to Dinas Junction on the LNWR. It has also previously been named both "Snowdon" and "South Snowdon".

Contents

"Rhyd Ddu" is Welsh for "Black Ford".

A station for Snowdon

In promotion of the line in the late 1880s, and knowing that there were discussions afoot to construct a railway up Snowdon from Llanberis, the Company renamed the station as "Snowdon". Some in Llanberis thought this misleading, but as contemporary literature pointed out -

"Visitors should bear in mind that in climbing Snowdon by this line (ours), they are conveyed by the "Toy" railway to a height of nearly 900 feet above sea level , so that they have quite two miles less to traverse from Snowdon station, compared to the Llanberis distance and about 800 feet less to reach the summit."

Visitors were by now alighting at this halt in droves, and nearby Beddgelert consequently received many more visitors. (Horse-drawn road vehicles provided the link to Beddgelert, the connections being included in the railway's timetable. It was largely as a consequence of this that in 1893 a deputation of interested parties from Llanberis went to see landowner Mr Assheton-Smith, of the Vaenol Estate, who had previously been opposed to any railway up Snowdon, to try and convince him that Beddgelert was fast displacing Llanberis as the main centre for ascending the mountain. Assheton-Smith was ultimately convinced, and The Snowdon Mountain Tramroad and Hotels Co. Ltd. was established in November the following year.

Prior to the line's subsequent take-over by the Welsh Highland Railway, a report by Major Spring, commissioned by the Festiniog Railway, referred to "Rhyddu [sic] or Snowdon Station". After take-over, the line was extended southwards to Beddgelert and Porthmadog in 1923, the station name at some point being changed to "South Snowdon".

Closure

Passenger services ceased to the old station site on 26 September 1936.

2003 re-opening

Following reconstruction, the section from Waunfawr to Rhyd Ddu was formally reopened by HRH the Prince of Wales on 30 July 2003. Prince Charles travelled from Waunfawr to Snowdon Ranger in the replica of a North Wales Narrow Gauge Railways coach, and from there to Rhyd Ddu on the footplate of the Ffestiniog Railway locomotive "Prince", built in 1863, which hauled the special train.

Public passenger services commenced on 18 August 2003 and the station was reopened to passengers on 18 August 2003 on a new site slightly to the east (the car park occupies the original site) following the complete reconstruction of the railway from Waunfawr to Rhyd Ddu. An honoured guest that day was Mr Richard Williams of Beddgelert who had travelled on the first train in 1923.

Train services are now operated by the Festiniog Railway Company's Welsh Highland Railway subsidiary.

Facilities

Rhyd Ddu station is the starting point of the 'Rhyd Ddu' footpath to the summit of Snowdon.

There are public toilets and a car park adjoining the station. The Snowdonia Sherpa bus service to Beddgelert and Porthmadog or Pen-y-Pass calls at the station.

Welsh Highland Railway Phase 4 and 2006 reconstruction

Work on Phase 4, the long final section of the Welsh Highland Railway from Rhyd Ddu to Porthmadog, started at Rhyd Ddu in 2005.

In February and March, 2006, the station underwent a large extension to allow through running trains to Porthmadog. This included two water towers for trains running in both directions, a "Rhyd Ddu Yard" with two sidings, one capable of stabling a train, and building a new southerly extension to the platform that extends it to the 200 m standard length platform of this route. There is also a waiting shelter and occasional ticket office. Trackwork modifications were completed to permit right-hand running (normal WHR and FR practice) into and through the station. Unfortunately, for the 2006 reopening of the station on 8 April, the trackwork for the Up loop had not been consolidated sufficiently to allow carriages to use the Porthmadog bound platform, due to a mechanical failure of the tamper. For the period between the reopening and 1 June 2006, when right hand running commenced, temporary operating instructions were in place whilst trains continued to run into the left hand line.

References

Rhyd Ddu railway station Wikipedia