Puneet Varma (Editor)

Raritan Bay Drawbridge

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Crosses
  
Raritan River

Other name(s)
  
River Draw

Design
  
Swing bridge

Longest span
  
101 m

Location
  
The Amboys

Owner
  
NJ Transit

Locale
  
The Amboys, New Jersey

ID number
  
NJT 400

Opened
  
1908

Body of water
  
Raritan River

Bridge type
  
Swing bridge

Raritan Bay Drawbridge httpsuploadwikimediaorgwikipediacommonsthu

Carries
  
New York and Long Branch (to 1976) Conrail North Jersey Coast Line

Similar
  
Lyndhurst Draw, WR Draw, Upper Hack Lift, Newark Drawbridge, HX Draw

Nj transit multi level train crosses the raritan bay drawbridge


The Raritan Bay Drawbridge, also known as River Draw, Raritan Bay Swing Bridge, and Raritan River Railroad Bridge, is a railroad swing bridge crossing the Raritan River a half mile from where in empties into the Raritan Bay in Middlesex County, New Jersey, United States. It connects Perth Amboy to the north and South Amboy to the south.

Contents

History

The bridge was built in 1908 to a replace one that had been built at the crossing in 1875 to serve the New York and Long Branch Railroad, jointly operated by the Central Railroad of New Jersey (CNJ) and Pennsylvania Railroad (PRR). Soon after its construction the bridge wad damaged in a severe winter storm. The bridge has been owned by several different parties since the CNJ/PRR era: Penn Central (1968–1971), the New Jersey Department of Transportation (to 1983), and New Jersey Transit (NJT).

Operations

The bridge is used by NJT commuter rail on its North Jersey Coast Line and for Conrail-Norfolk Southern rail freight operations. Federal regulations require the bridge to be open on signal except during rush hour or when a train has passed the home signal for it.

Replacement

The drawbridge was scheduled to be replaced after suffering structural damage from Hurricane Sandy in 2012. The bridge was overwashed by the storm surge, struck by two tugboats, and had to be realigned before low-speed service could resume a month later. A $446 million federal grant, announced in 2014, will fund construction of a new bridge, which is expected to take 4–5 years while trains continue using the existing bridge.

References

Raritan Bay Drawbridge Wikipedia