Samiksha Jaiswal (Editor)

Rantau Panjang–Sungai Golok Bridge

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Carries
  
Motor vehicles

Opened
  
21 May 1973

Width
  
12 m

Location
  
Rantau Panjang

Design
  
Box girder bridge

Total length
  
110 m

Body of water
  
Golok River

Bridge type
  
Box girder bridge

Crosses
  
Kolok River, Malaysia-Thailand Border

Locale
  
Rantau Panjang, Kelantan

Official name
  
Rantau Panjang–Sungai Golok Bridge

Longest span
  
30.48 m (100 ft), each of 3 spans

Address
  
Kampung Rantau Panjang, 17200 Rantau Panjang, Kelantan, Malaysia

Similar
  
Bukit Bunga–Ban Buketa Br, Rantau Panjang railway st, Pasir Mas railway station, Wakaf Bharu railway st, Sultan Ismail Petra Silv

Rantau Panjang–Sungai Golok Bridge (Malay: Jambatan Rantau Panjang–Sungai Golok, Thai: สะพานโก–ลก), popularly called the "Harmony Bridge" (Malay: Jambatan Muhibah), is a road bridge crossing Kolok River (Malay: Sungai Golok) of the Malaysia–Thailand border, connecting Rantau Panjang town in Kelantan, Malaysia, with Su-ngai Kolok town in Narathiwat, Thailand; spanning to the south of cross-border railway bridge nearby. The bridge is a part of Asian highway network AH18, including Thailand Route 4056 and Federal Route . It was jointly built by the governments of both countries, and was officially opened on 21 May 1973 by both Malaysian Prime Minister Tun Abdul Razak bin Haji Dato' Hussein Al-Haj and Thai Prime Minister Field Marshal Thanom Kittikachorn.

Contents

Design

The bridge is a beam bridge with box girders. Main part includes 3 spans, using prestressed concrete, with each length of 30.48 m (100 ft). Each end is connected to a ferroconcrete span, with length of 9.14 m (30 ft). It is overall 109.73 m (360 ft) long, with 7.32 m (24 ft) wide road surface and 2.13 m (7 ft) wide walkway each side.

Construction

Construction was done by Chang Loon Construction Co., Ltd., a Malaysian contractor which won the bidding-held meanwhile in both countries-on 25 September 1970. The ask price was M$630,000 or ฿4,500,000. A contract was signed on 16 December 1970, as both governments paid half each. Since the construction was finished on 20 March 1973, after deadline on 15 June 1972, then the company had to pay overtime penalty M$200 or ฿1,400 a day; totally M$36,000 or ฿252,000.

References

Rantau Panjang–Sungai Golok Bridge Wikipedia