Neha Patil (Editor)

Pulangi Dam

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
Philippines

Status
  
Operational

Type of dam
  
Gravity/embankment

Catchment area
  
18,000 km²

Construction began
  
1982

Location
  
Maramag, Bukidnon

Opening date
  
1986

Opened
  
1986

Surface area
  
19.85 km²

Impound
  
Pulangi Dam wwwnapocorgovphNPCDamsimagesOurDamsPulangi

Official name
  
Pulangi IV Hydroelectric Power Station

Similar
  
Binga Dam, Caliraya Dam, Casecnan Dam, Magat Dam, Pantabangan Dam

Pulangi dam video 2 mp4


The Pulangi IV Hydroelectric Power Plant, also known as the Pulangi Dam, is located on the Pulangi River near Maramag in Bukidnon province on the island of Mindanao in the Philippines. It uses two reservoirs, produced by damming the Pulangi River, to supply water to a run-of-the-river hydroelectric power plant; the power plant is capable of generating 255 megawatts (342,000 hp) of power. Construction began in 1982; the first two generators became operational in December 1985, with the last generator being commissioned in 1986.

Contents

Map of Pulangi IV Hydroelectric Power Plant, Maramag, Bukidnon, Philippines

The upper (pondage) reservoir located at 7°47′11″N 125°1′25″E diverts water into a power channel which parallels the river until it reaches the lower reservoir (surge pool) at 7°42′56″N 125°1′25″E, 7.5 km (5 mi) to the south. At the lower reservoir, water is fed to each of the three 85 MW (114,000 hp) Francis turbine-generators via a penstock. The Pulangi IV power plant provides 23% of the hydroelectric power generated on Mindanao.

Since operation, the reservoirs associated with the power plant have received an estimated 1,500,000 m3 (1,216 acre·ft) of sediment annually. Of the reservoir's combined 67,000,000 m3 (54,318 acre·ft) active capacity, 23,000,000 m3 (18,646 acre·ft) has been filled with silt. The siltation rate was almost 1 meter annually and caused the dam's reservoir to work at 50% capacity. The unexpected siltation threatens safe operation of the dams and power generation, in addition to drastically shortening the predicted operational lifespan of the dam. At first, the minimum and maximum water levels were raised and, in 2007, dredging work was performed around the head work of the upper reservoir's head. Selective dredging in the upper reservoir began in 2010, and continues as of 2011.

References

Pulangi Dam Wikipedia


Similar Topics