Rahul Sharma (Editor)

Puget Sound Electric Railway

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Reporting mark
  
PSE

Length
  
199.4 mi (320.9 km)

Dates of operation
  
1902–1928

Locale
  
Washington

Puget Sound Electric Railway httpsuploadwikimediaorgwikipediacommonsthu

Headquarters
  
Kent, Washington, United States

The Puget Sound Electric Railway was an interurban railway that ran for 38 miles between Tacoma and Seattle, Washington in the first quarter of the 20th century. Portions of the right-of-way still exist as multi-use trail through Milton, Washington, as well as from Pacific to Tukwila, Washington.

Contents

History

The PSE began operations on September 25, 1902 with a line that started in downtown Tacoma, ran along Pacific and Puyallup Avenues, followed the course of present day Pacific Highway through Fife and to Milton, turned southeast towards Puyallup and paralleled the path of today's SR 167 through Pacific, Algona, Auburn, Kent, Orillia and Renton, then into Seattle on its own dedicated right-of-way, via South Park, from there running on surface streets to the area near Pioneer Square, where it interchanged with other interurbans in the area.

Power was supplied via overhead wire in urban areas, and third rail in rural areas. The third rail was the cause of several accidents throughout the PSE's operations which involved livestock or people being electrocuted, and in some cases dead cows caused accidents involving the trolleys themselves.

The railroad ran for 26 years, until competition from trucks, buses, and automobiles on an ever-expanding road network, as well as the steam railroads led to reduced ridership in the early 1920s, leading to a decision to shut down in 1928. Residents all along the line protested the decision, however, and the rails were not pulled up until 1930.

It was headquartered in Kent, Washington.

Second life

Portions of the PSE exist today as multi-use trails in Milton and linking Tukwila, Kent, Auburn, Algona, and Pacific in King County. The City of Edgewood's portion is currently in planning stages, with construction slated to begin in the Summer of 2011.

References

Puget Sound Electric Railway Wikipedia


Similar Topics