Neha Patil (Editor)

Prirazlomnoye field

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
Operator
  
Sevmorneftegaz

Region
  
Start of production
  
2011

Offshore/onshore
  
offshore

Partner
  
Discovery
  
1989

Prirazlomnoye field Prirazlomnoye Gazprom Neft PJSC

Estimated oil in place
  
610 million barrels (~8.3×10^ t)

Prirazlomnoye field is an Arctic offshore oilfield located in the Pechora Sea, south of Novaya Zemlya, Russia. The field development is based on the single stationary Prirazlomnaya platform, which is the first Arctic-class ice-resistant oil platform in the world. Commercial drilling was planned to begin in early 2012, however it was delayed at least until the Spring of 2013 due to "safety concerns". This is the first commercial offshore oil development in the Arctic. Serious safety concerns have been raised about Prirazlomnoye platform, citing use of decommissioned equipment (the 1984 TLP upper section of the rig), however Gazprom’s oil spill response plan for Prirazlomnaya was renewed in 2014, and most questions found its answers. The Arctic Prirazlomnoye field produced the 10 millionth barrel of Russian North Arctic Oil in March 2016.

Contents

History

Prirazlomnoye field Gazprom Produce Millionth Tonne of Oil from Prirazlomnoye Field

The field was discovered in 1989. In 1993, the development license was issued to Rosshelf, a subsidiary of Gazprom, and the field was to be operational by 2001. In June 2000, Gazprom and German energy company Wintershall signed a memorandum on cooperation in developing the Prirazlomnoye field. Also Rosneft wanted to join the project. In 2002, the license was transferred to Sevmorneftegaz, a joint venture of Gazprom and Rosneft. Later Sevmorneftegaz became a wholly owned subsidiary of Gazprom. There is a plan to pass the Prirazlomnoye development to Gazprom Neft, an oil arm of Gazprom. The name Prirazlomnoye means "at the geological fault".

Reserves

Prirazlomnoye field has reserves of 610 million barrels (97 million cubic metres).

Development

Prirazlomnoye field wwwoffshoreenergytodaycomwpcontentuploads201

The field development concept is based on the single stationary Prirazlomnaya platform. The oil platform, constructed by Sevmash shipyard in Severodvinsk, was expected to be completed by 2011 and after that the drilling would start. The Prirazlomnaya platform was equipped with the topside of the decommissioned 1984 tension-leg platform (TLP) Conoco's Hutton field, which was the first ever built tension-leg platform. Produced oil will be transported by double acting shuttle oil tankers Mikhail Ulyanov and Kirill Lavrov, built in Admiralty Shipyard and operated by Sovcomflot, to floating storage and offloading vessel Belokamenka, located in Kola Bay near Murmansk. Gazprom considers to build an oil refinery in Teriberka at the location of the LNG plant of the Shtokman's development for processing oil from Prirazlomnoye and Dolginskoye fields.

Prirazlomnoye field Prirazlomnoye field

The concept of the development was designed by Vniigaz Institute, a subsidiary of Gazprom. The estimated maximum annual oil production volume is expected to be 6.6 million tonnes. The total investment is expected to be about US$1.03 billion.

The first oil from Prirazlomnaya

Prirazlomnoye field Prirazlomnoye field

The construction of the Prirazlomnaya took almost a decade. The platform installation was towed to the Pechora Sea in August 2011, however it took 2.5 years before the production started in December 2013. In 2014, Gazprom expects to deliver at least 300000 tones of the Arctic crude (ARCO).

Environmental issues

According to study of possible Arctic oil spill scenarios from the oil platform Prirazlomnaya completed by Russian scientists, together with environmentalists from Greenpeace and WWF-Russia Greenpeace and the World Wildlife Fund Gazprom is not prepared to deal adequately with a spill associated with oil production. The Russian Ministry of Emergency confirmed that Gazprom’s oil spill response plan expired in July 2012, making any drilling the company undertakes in the Arctic illegal until a new one is submitted and approved. On 24 August 2012, a group of Greenpeace activists under Kumi Naidoo scaled the platform and put up a banner "Don't kill the Arctic".

On 18 September 2013, Greenpeace's ship Arctic Sunrise circled the Prirazlomnaya oil rig while three crew attempted to board the platform. In response, the Russian Coast Guard seized control of the ship and detained the activists. The ship was subsequently towed by a coastguard vessel to the Russian Arctic port of Murmansk. The crew consisted of thirty members from sixteen different nationalities. The Russian government has intended to charge the Greenpeace activists with piracy, which carries a maximum penalty of fifteen years of imprisonment. It was the stiffest response that Greenpeace has encountered from a government since the bombing of the Rainbow Warrior in 1985, said Phil Radford, executive director of Greenpeace USA. The Netherlands launched legal action to free 30 Greenpeace activists charged in Russia with piracy. Arctic Sunrise is a Dutch-flagged ship. Foreign Minister Frans Timmermans said the Netherlands had applied to the UN's Tribunal for the Law of the Sea, which resolves maritime disputes between states. The Netherlands view the ship's detention as unlawful.

References

Prirazlomnoye field Wikipedia


Similar Topics