Girish Mahajan (Editor)

Perpignan–Barcelona high speed rail line

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Type
  
high-speed rail

Status
  
Operational

Rolling stock
  
AVE Class 100 (2014–)

System
  
TGV, AVE

Opened
  
2013

Perpignan–Barcelona high-speed rail line httpsuploadwikimediaorgwikipediacommonsthu

Locale
  
France (Languedoc-Roussillon), Spain (Catalonia)

Owner
  
SNCF Réseau (French side), Adif (Spanish side)

Terminis
  
Barcelona Sants railway station, Gare de Perpignan

The Perpignan–Barcelona high-speed line is an international high-speed rail line between France and Spain. The line consists of a 175.5-kilometre (109.1 mi) railway, of which 24.6 km are in France and 150.8 km are in Spain. It crosses the French–Spanish border via the 8.3-kilometre (5.2 mi) Perthus Tunnel bored under the Perthus Pass, connecting two small cities on opposite sides of the border, Perpignan in Roussillon, France, and Figueres in Catalonia, Spain. The line extends to Barcelona, and this part is sometimes referenced as an extension of the Madrid–Barcelona high-speed rail line. The Perpignan–Barcelona line is a part of the Mediterranean Corridor.

Contents

History

The construction contract for the international section of the line between Perpignan and Figueres was awarded on 17 February 2004 to the TP Ferro consortium, a joint venture of Eiffage (France) and Dragados (Spain). The group constructed the line for an estimated cost of approximately €1.1 billion, and will operate it for 53 years. It received a public subsidy of €540 million, split between the European Union, France and Spain. Test running started in November 2008, and the international section officially opened on 17 February 2009, but services were delayed until December 2010 because the station at Figueres was not finished. Services in the section started on 19 December 2010 with a TGV service from Paris via Perpignan to Figueres–Vilafant and regular freight traffic started on 21 December 2010. Eventually the 44.5-kilometre (27.7 mi) international section was officially inaugurated on 27 January 2011.

The Spanish 131-kilometre (81.4 mi) Barcelona–Figueres section was originally planned to open in 2009 but there have been delays in building a 4-kilometre tunnel in Girona, the first phase of which was finished in September 2010, and controversy over the route between Sants and Sagrera stations in Barcelona. The section was eventually completed in January 2013 at a cost of €3.7 billion and the entire line officially opened on 8 January 2013.

Line

The track on the new line is standard gauge using 25 kV AC railway electrification at 50 Hz, consistent with the French LGV and Spanish AVE high-speed rail networks. The line is used by both passenger and freight trains, the maximum grade being limited to 1.2%. The design speed is 350 km/h.

This line was the first connection constructed without a break-of-gauge and the first international connection to the standard-gauge Spanish AVE network. Traditional Spanish rail lines are broad gauge based on the Spanish vara 1,668 mm (5 ft 5 2132 in), so rail connections between France and Spain have traditionally involved a break-of-gauge, implying that passengers and cargo must either change trains, or the trains must pass through gauge-changing installations at the border. Another same-gauge connection to France is planned near the Atlantic coast in the Basque country, and a third link via Huesca crossing the central Pyrenees mountains through a 40 km tunnel is under study.

France has left-hand traffic and Spain right-hand, so a flyover was built around 10 km north of the border (42.55929°N 2.85120°E / 42.55929; 2.85120).

Services

A TGV service from Paris via Perpignan started on 19 December 2010 to a temporary station at Figueres and a connecting service on the classic line on to Barcelona and Madrid. The total journey time from Paris to Barcelona has been reduced by 1h 15m to 7h 25m. Of that, 5h 30m was spent on the Paris to Figueres segment. Initially there was a service of two Paris-Figueres TGVs per day, which connected with two RENFE Alvia trains a day between Barcelona and Figueres via the conventional broad gauge line and a temporary double gauge track. From January 2013 there was a service of nine RENFE AVE trains a day between Figueres and Barcelona with eight services continuing on to Madrid.

RENFE started a standard-gauge freight service on 21 December 2010. As of January 2011 four freight trains a week run over the line from Barcelona, with journey times reduced by 6 hours: one train each way to Lyon, and one each way to Milan.

On 28 November 2013, RENFE and SNCF announced the opening of direct long-distance services from 15 December 2013, with daily trains between Paris – Barcelona, Toulouse – Barcelona, Lyon – Barcelona, Marseille – Madrid. Since December 2013 the journey time for the TGV Paris–Barcelona service has been 6 hours 25 minutes.

Future

Lyon to Barcelona is expected to take less than four hours using the classic line in France between Perpignan and Nîmes. A new company jointly owned by RENFE and SNCF is to be formed to run services between Paris and Madrid. Ten new trains are to be purchased at a cost of €300 million.

In May 2010 it was announced that tendering had started for the Nîmes–Montpellier bypass route. This will be the first stage in the link between the Spanish high-speed network and LGV Méditerranée and the line will carry a mix of freight and high-speed trains. A 25-year Public–Private Partnership agreement was signed in June 2012 and the line is expected to be opened in December 2017.

Work on the 150 km LGV Montpellier-Perpignan is not expected to start until 2020, following public consultation beginning 2015. However, the preliminary high-speed route and station locations have been approved by the French transport ministry in February 2016.

References

Perpignan–Barcelona high-speed rail line Wikipedia