Kalpana Kalpana (Editor)

Oyan River Dam

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Location
  
Ogun State, Nigeria

Impounds
  
Oyan River

Creates
  
Oyan lake

Height
  
30 m

Catchment area
  
9,000 km²

Turbine
  
3

Opening date
  
29 March 1983

Length
  
1044 m

Total capacity
  
270 million m

Opened
  
29 March 1983

Surface area
  
40 km²

Oyan River Dam poiapihotelsngpoi235img20160323134002jpg

Similar
  
Ikere Gorge Dam, Tiga Dam, Dadin Kowa Dam, Bakolori Dam, Kainji Dam

The Oyan River Dam is in Abeokuta North local government area of Ogun State in the West of Nigeria, about 20 km north west of the state capital Abeokuta. The dam crosses the Oyan River, a tributary of the Ogun River. It is used primarily to supply raw water to Lagos and Abeokuta, but has potential for use in irrigation and power generation.

Contents

Map of Oyan River Dam, Nigeria

Structure

The dam was commissioned on 29 March 1983 by president Shehu Shagari, and is operated by the Ogun-Osun River Basin Development Authority. The lake is in the savannah region, with sparse trees and grasses and low fertility. It covers 4,000 hectares and has a catchment area of 9,000 km2. The dam has a crest length of 1044 m, height 30.4 m and gross storage capacity of 270 million m3. It was designed to supply raw water to Lagos and Abeokuta, and to support the 3,000 hectare Lower Ogun Irrigation Project. Three turbines of 3 megawatts each were installed in 1983 but as of 2007 had not been used.

Impact

During construction, 22 villages were submerged, with the displaced people moved to three settlement camps. Some of the settlers fish the lake and farm vegetables along the fertile shoreline as the lake recedes in the dry season. A 2009 study of levels of urinary schistosomiasis in the Ibaro-Oyan and Abule Titun communities, which depend on the Oyan Dam for their livelihood, found high levels of infection due to use of untreated water. An earlier study in 1990-1993 had indicated that the risk of the disease, which is carried by snails, could be greatly reduced if the reservoir were continuously discharged during the hot dry season.

Operations

In May 2009, after heavy rainfall the dam operators were forced to release exceptional amounts of water from the dam for safety reasons, causing some flooding over an area of 2,800 hectares. In February 2010 the dam was failing to deliver sufficient raw water for the Abeokuta water works to meet demands. The water works was also struggling with equipment failure due to a power surge. Residents of Abeokuta were forced to rely on rivers and streams to meet their water needs. The Ogun State Water Corporation attributed the problem to the unreliable supply of electricity from the Power Holding Corporation of Nigeria.

Potential

In 2010 the federal government budgeted N43 million for construction of the gravity irrigation scheme at the dam and N11 million for dam operations. The dam was intended to support 3,000 hectares in the first phase, but the land had been lying fallow. In November 2009 the Minister of Power, Rilwan Lanre Babalola paid an inspection visit to the dam and said the Federal Government had earmarked a substantial sum for rehabilitation of hydro-electric Dams across the country. The lake is relatively rich in fish and other wildlife, and has potential for ecotourism.

References

Oyan River Dam Wikipedia