Girish Mahajan (Editor)

Ordu Nefise Akçelik Tunnel

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Start
  
Yarlı

Work begun
  
1997

Ordu Nefise Akçelik Tunnel Tuneller

Location
  
Perşembe, Ordu Province

Coordinates
  
Ordu Nefise Akçelik Tunnel Location of Ordu Nefise Akçelik Tunnel in Turkey

Constructed
  
Nurol-Tekfen-Yüksel joint venture

Opened
  
April 7, 2007; 9 years ago (2007-04-07)

Operator
  
General Directorate of Highways

Similar
  
Ilgaz 15 July Independ, Cape Jason, 19 Eylül Stadium, Taşbaşı Church, SS Bandırma

Ordu Nefise Akçelik Tunnel (Turkish: Ordu Nefise Akçelik Tüneli), originally Hapan Tunnel, (Turkish: Hapan Tüneli) is a highway tunnel constructed in Ordu Province, northern Turkey. With its length of 3,825 m (12,549 ft), it is the country's longest tunnel. The tunnel is named in honor of the Turkish female civil engineer and earth scientist Nefise Akçelik (1955-2003).

Contents

Ordu Nefise Akçelik Tunnel Guide Yarli in Turkey Ordu Tripmondo

Construction

Ordu Nefise Akçelik Tunnel wowturkeycomtr47kErkutAorduhapantunelijpg

Ordu Nefise Akçelik Tunnel is part of the Samsun-Ordu Highway within the Black Sea Coastal Highway, of which construction was carried out by the Turkish Nurol-Tekfen-Yüksel joint venture. The cost of the tunnel totalled to TL 361 million (approx. US$265 million as of 2007 exchange rate). The 3,805 and 3,825 m (12,484 and 12,549 ft)-long twin-tube tunnel carrying two lanes of traffic in each direction is flanked by 170–135 m (558–443 ft)-long Tekkebak Tunnel in the west and 310–314 m (1,017–1,030 ft)-long Asarkayası Tunnel in the east on the same highway. Traffic in the tunnel is controlled by 81 cameras at 16 different stations.

Ordu Nefise Akçelik Tunnel Ordu Nefise Akelik Tneli

The tunnel crosses mountainous area between the settlements Yarlı and Kırlı in Perşembe district of Ordu Province at 220 m (720 ft) elevation. It allows a short cut of 15 km (9.3 mi) between the town Fatsa and the city of Ordu saving one and half hours driving time.

Naming and opening to traffic

Ordu Nefise Akçelik Tunnel Tuneller

Originally, the tunnel was named Hapan Tunnel. Its name was changed to Nefise Akçelik (1955-2003) in honor of the female civil engineer and earth scientist, who, working at the General Directorate of Highways, contributed much to the construction of tunnels in Turkey.Finally, it was officially renamed Ordu Nefise Akçelik Tunnel in March 2007.

Ordu Nefise Akçelik Tunnel Ordu Nefise Akelik Tneli YouTube

The tunnel was opened to traffic on April 7, 2007 by Turkish Prime Minister Recep Tayyip Erdoğan. Dangerous goods carriers are not permitted to use the tunnel.

References

Ordu Nefise Akçelik Tunnel Wikipedia