Crosses
  
Tudor Creek

Total length
  
396 m

Longest span
  
152 m

Body of water
  
Tudor Creek

Design
  
concrete girder bridge

Opened
  
2002

Bridge type
  
Girder bridge

Locale
  
Kenya

Nyali Bridge

Carries
  
Road traffic, pedestrians

Address
  
Nyali Road, Mombasa, Kenya

Similar
  
Mombasa Island, Fort Jesus, Haller Park, Mombasa Marine National, Nguuni Nature Sanctuary

Confrontation between police and joho convoy on nyali bridge


The Nyali Bridge is a concrete girder bridge connecting the city of Mombasa on Mombasa Island to the mainland of Kenya. The bridge crosses Tudor Creek (a tidal inlet) to the north-east of the island. The bridge is one of three road links out of Mombasa (the others being the Kipevu and Makupa Causeways). The Likoni Ferry provides a third transport link to the island, and is situated at the southern tip. The mainland approach to the bridge serves as a police checkpoint in both directions.

Contents

Crossing over the nyali bridge


Cost

The Old Nyali Bridge (a floating bridge) stood approximately 800 m downstream from the current crossing.

The bridge was constructed through loan acquired by government from Japan in 1976. The loan amount was JPY 4,900,000,000 (approx Kshs. 2,631,300,000). The Exchange rate at the time was $1=JPY305.15 This amount is equivalent of $16m. If adjusted for inflation, using an inflation calculator, this would be $66m.

Details

It is 391.65 metres long and 26.3 metres wide with a total of six lanes. The main bridge is 330 metres prestressed continuous box girder over three spans with the centre span of 150 metres. The outer spans are 90 metres each. The bridge is founded on piled foundation. Nyali Bridge includes an approach bridge with three spans totalling 61.65 metres whose superstructure is simply reinforced concrete beams and deck. Since its completion in 1980, no periodic maintenance was done to the bridge until 2005 when major repairs to the bridge were carried out. The repairs included post tensioning the box girder and shear strengthening using crack sealing and use of steel plates on the internal face of the box girder.