North–South connection

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Status
  
Operational

Line length
  
3.8 km (2.4 mi)

Electrification
  
3 kV DC

Locale
  
Belgium

Number of tracks
  
six tracks

Opened
  
1952

North–South connection

Track gauge
  
1,435 mm (4 ft 8 ⁄2 in) standard gauge

Operator
  
National Railway Company of Belgium

Terminis
  
Brussels-South railway station, Brussels-North railway station

Similar
  
Brussels‑South railway station, Brussels‑North railway station, Brussels‑Congress railway station, Schuman railway station, Brussels Central Station

The North–South connection (French: Jonction Nord-Midi, Dutch: Noord-Zuidverbinding) is a railway link of national and international importance through the centre of Brussels, Belgium, that connects the major railway stations in the city. It is line 0 (zero) of the Belgian rail network. With 1200 trains a day it is the busiest railway line in Belgium and the busiest railway tunnel in the world. It has six tracks and is used principally for passenger trains. It is partially underground (around Brussels Central station) and partially raised above street level.

Contents

Map of Jonction Nord-Midi, Belgium

History

Brussels was served by two main railway stations: Brussels North (opened 1846) and Brussels South (opened 1869, replacing a nearby station of 1840). They are located just outside opposite ends of the Pentagon – a ring of roads which follow the boundary of the old city walls. Shortly after opening, both stations were handling large volumes of commuter, regional and international passengers, but through journeys required disembarking and a street-level transfer through the city's old town, a distance of over 3 kilometres (2 mi).

The idea of an underground railway line linking the two stations was first suggested in the 1860s as part of a proposal for the covering of the Senne. That proposal was never implemented. The current version was planned before World War II, after a decision originally made in 1909, and it came into service on 5 October 1952. Both stations were demolished and reconstructed to allow through services, reopening in 1952.

Three new intermediate stations were constructed along the route to serve the city centre. Two of them, Brussels Chapel and Brussels Congress, were intended stops only for local commuter services and have never been heavily used. The largest of the new stations, Brussels Central, was built to additionally serve regional and international services transiting through Brussels. The combination of a city-centre location and numerous services to diverse destinations led to Brussels Central becoming the busiest station in Belgium. Brussels North, Brussels Central and Brussels South are now the three main railways stations in the city; they are also the three busiest stations in all of Belgium.

The North–South connection was selected as the main motif of a very high value collectors' coin: the Belgian 50th Anniversary of the North-South connection commemorative coin, minted in 2002. The obverse front side shows a train coming out of the North–South connection tunnel, it being one of the most famous rail links in Belgium. On the coin is written the words “Noord-Zuidverbinding Jonction Nord-Midi” (North-South connection in Dutch and French) and the years 1952 (representing the opening of the connection) and 2002.

Stations

The stations on the line, from north to south, are:

  • Brussels North (French: Bruxelles-Nord (STIB: Gare du Nord), Dutch: Brussel-Noord (MIVB: Noordstation))
  • Brussels Congress (French: Bruxelles-Congrès, Dutch: Brussel-Congres)
  • Brussels Central (French: Bruxelles-Central (STIB: Gare Centrale), Dutch: Brussel-Centraal (MIVB: Centraal Station))
  • Brussels Chapel (French: Bruxelles-Chapelle, Dutch: Brussel-Kapellekerk)
  • Brussels South (French: Bruxelles-Midi (STIB: Gare du Midi), Dutch: Brussel-Zuid (MIVB: Zuidstation)) (the Eurostar, Thalys, TGV and ICE international terminal)
  • The stations of Brussels North and Brussels South are also linked by the premetro north-south axis, which runs through the city centre to the west of the railway line.

    Operations

    Most national (inter-city and local) trains that use the line stop at North, Central and South stations. The international Thalys, Eurostar and TGV services stop only at the international terminal of Brussels South. ICEs have an additional stop at Brussels North. Congress and Chapel stations are served only by a limited number of trains during weekday working hours.

    The line is used by very few freight trains. To avoid further congestion, most freight traffic crossing between the north and south of Brussels is routed instead along either line 26, to the east (Halle to Vilvoorde, via Merode), or along line 28, to the west (Brussels South to Bockstael railway station via Brussels-West station and Simonis).