Kalpana Kalpana (Editor)

New South Wales Z25 class locomotive

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Power type
  
Steam

Build date
  
1881–1885

Configuration
  
2-6-0

Builder
  
Beyer, Peacock & Co.

Total produced
  
70

New South Wales Z25 class locomotive

Serial number
  
2073–2092, 2308–2337, 2547–2565

The Z25 class (formerly B.205 class) was a class of 2-6-0 wheel arrangement steam locomotives built by Beyer, Peacock & Co. for the New South Wales Government Railways of Australia.

Contents

Design

In the late 1870s, only 11 of the 82 goods locomotives in service on the Southern and Western lines of the New South Wales Government Railways had a leading truck. The balance had a wheel arrangement of 0-6-0. To provide a more suitable locomotive for use over the 8 chain (161 m) radius curves of the Blue Mountains line, it was decided to incorporate a Bissell pony truck on an improved version of the A93 class.

Beyer, Peacock and Company prepared a design which was considered to be in advance of British contemporary practice. The first twenty 205 class entered service in 1882.

In service

The new engines were found to be more sluggish than the 93 class when getting away with a load, but pulled decidedly better when running tender first. Following tests on the Blue Mountains, Commissioner Goodchap recommended the installation of 50 ft. (15.25 m) turntables at Sydney, Bathurst and Goulburn which were required to turn the new locomotives. Four were allocated to the then isolated Northern network.

At that time, there were thirty 93 class locomotives on order. As Locomotive Engineer W. Scott considered the new 205 class better suited to his requirements, the order was amended to thirty 205 class locomotives, but with some minor improvements. These entered service in 1883/84, eight being allocated to Northern network.

Both batches were found to be prone to slipping and additional weight was necessary to be added to the driving wheels.

A further twenty locomotives arrived in 1885, five of which going to the Northern system. This last batch had cabs with steel cutaway sides, an improvement on the open cabs of the earlier batches.

In the late 1880s the class were based at Sydney, Goulburn, Penrith, Bathurst, Newcastle, Murrurundi and Armidale.

From February 1901, all of the class were fitted with larger Belpaire boilers which increased their weight and also increased the heating surface, matters identified as deficient in William Thow’s Report of 1889. At the same time, wooden cabs replaced the open cabs of the earlier batches.

With the arrival of the T524 class locomotives in 1896, main line work began to be assigned to these newer classes and the 205 class were relegated to lighter branch lines.

During the years of the Great Depression, many of these locomotives fell into derelict condition after becoming due for overhaul. Some were used during the load testing of the Sydney Harbour Bridge in 1932.

References

New South Wales Z25 class locomotive Wikipedia