Harman Patil (Editor)

New Jersey Midland Railway

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
New Jersey Midland Railway

The New Jersey Midland Railway was a 19th-century predecessor to the New York, Susquehanna and Western Railway (NYS&W) that operated in Northern New Jersey and Orange County, New York.

Contents

Formation and construction

The Hoboken, Ridgefield and Paterson Railroad was chartered in 1866 to connect Paterson with the ports along the Hudson River waterfront.

The New Jersey Midland Railway (NJM) was formed in 1870 as a consolidation of several smaller railroads. The original plan was to cut through the Hudson Palisades near Englewood and run south along the Hudson River to Weehawken, but the company lacked the money to do so, and instead made arrangements to run through the Pennsylvania Railroad's cut from Marion Junction through Bergen Hill in Jersey City to their Exchange Place Terminal.

One of the consolidated companies, the New Jersey Western Railroad had built about ten miles of trackage from Hawthorne/Hawthorne (NYS&W station) to Bloomingdale from 1868 to 1870, including the Wortendyke (NYS&W station) before it was consolidated into the NJ Midland.

In 1871 built west from Two Bridges/Beaver Lake through Sussex County, including construction of the Backwards Tunnel, to the New York state line at Hanford, New Jersey, just south of Unionville, New York. The Ogden Mine Railroad was made obsolete. This was later known as the Hanford Branch.

By 1872 the NJ Midland completed the line between Hackensack and Newfoundland. It also built a line through the Ridgefields by 1872, but with no station. It joined the Erie Railroad Northern Branch at Granton Junction near Babbit, and reached the community of New Durham (near the point now under New Jersey Route 495 where the Susquehanna Transfer had later been located).

Hudson Connecting Railway

The charter for the NJ Midland prevented it from crossing any other railroad to reach the Hudson River, but a route along the foot of the west side of the Bergen Hill to reach the PRR took it across the Erie Railroad. So a new company with the same management, the Hudson Connecting Railway, was formed to build the final leg. With the intention to reach a terminal on the Hudson River, in 1873 the NJM built the Hudson Connecting ROW which south to West End Junction from New Durham, North Bergen near the point now known as CP 2 at what became North Bergen Yard. (The Susquehanna Transfer.

The southernmost part leased from the Erie Railroad's as their original terminus, which had been built as the Paterson and Hudson River Railroad. which accessed Erie's Long Dock Tunnel and Pavonia Terminal. The NJ Midland also served as a terminus for the Montclair Railway, which later became the New York and Greenwood Lake Railway. The lease provide access south to the PRR at Marion Junction.

Middletown, Unionville and Water Gap Railroad

In 1866, public meetings were held in Middletown Westtown and Unionville, New York to discuss the viability of a railroad via these hamlets to Deckertown, Sussex County, New Jersey. A route was surveyed from there to Middletown, but, as built, the Middletown, Unionville and Water Gap Railroad only extended from a connection with the NY&E in Middletown to Unionville, which was reached on December 6, 1867, after fourteen months of construction. Freight cars received from the Erie made the 14-mile (23 km) trip to Unionville starting January 13, 1868. The MU&WG was built to the 6-foot (1.8 m) broad gauge of the Erie. The road was leased to the Erie and commenced regular operations as the Erie's "Unionville Branch" on May 15, 1868. On January 11, 1866, the New York and Oswego Midland Railroad (NY&OM) was incorporated with the goal of linking Oswego, New York, on Lake Ontario, with the Hudson River at a point across from New York City. The NY&OM reached Middletown in 1871 and hoped to connect with three New Jersey companies to form a through route to the Port of New York and New Jersey. The link between the NY&OM and the NJM would be the MU&WG which was leased by the NY&OM effective April 1, 1872. The NY&OM soon entered bankruptcy and dropped the lease on the MU&WG which was then leased by the NJM in 1873. NYS&W and the Middletown and New Jersey Railroad use the line with shared trackage rights.

Bankruptcy and NYS&W

The NJ Midland went bankrupt and was sold to receivers in March 1875. By December 1878, a dispute broke out between various bondholders, some of whom disputed that the Hudson Connecting Railway should be included in the proceedings. On February 21, 1880, the NJ Midland, along with the Hudson Connecting Railway, was sold to Charles Parsons, who represented the bondholders of the first and second mortgages; the two railroads were combined into one.

In June 1881 the NJ Midland was consolidated with five other railroads to form the New York, Susquehanna and Western Railway with Frederic A. Potts and Garret Hobart serving as chief officers. The company expanded west into Pennsylvania along the Wilkes-Barre and Eastern Railroad.

The NYS&W later shifted its mainline to run along the ROW developed by the Lehigh and Hudson River Railway, designating the NJ Midland portion above Sparta Junction the Hanford Branch.

Stations and possible future use

Commuter service ended in 1966, but has been considered for restoration as the Passaic–Bergen Rail Line Existing original station buildings from the NJ Midland can be found at Maywood, Vreeland Avenue, Wortendyke, Butler, and Newfoundland among other places.

References

New Jersey Midland Railway Wikipedia