Suvarna Garge (Editor)

Nengo Bridge Hydroelectric Power Station

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
Uganda

Owner(s)
  
Jacobsen Elekro

Normal elevation
  
1,150 m (3,770 ft)

Status
  
Proposed

Impounds
  
Mirera River

Nengo Bridge Hydroelectric Power Station

Location
  
Nengo Bridge, Rukungiri District

Similar
  
Nyagak Hydroelectric Power St, Isimba Hydroelectric Power St, Bujagali Hydroelectric Power St, Ayago Hydroelectric Power St, Nalubaale Hydroelectric Power St

Nengo Bridge Hydroelectric Power Station, often referred to as Nengo Bridge Power Station is a planned 6.7 megawatts (9,000 hp) mini-hydroelectric power station in Uganda, the third-largest economy in the East African Community.

Contents

Location

The power station is located across the Mirera River between Rukungiri District and Kanungu District at the location of Nengo Bridge, along the road between Rukungiri and Kanungu. This location lies approximately 13 kilometres (8.1 mi), by road, southwest of Rukungiri.

Overview

Nengo Bridge Power Station is run of the river, mini-hydropower installation, with planned capacity of 6.7 MW. Jacobsen Elektro, a Norwegian power development company, through its Ugandan subsidiary, Jacobsen Elektro Uganda Limited, owns the development rights to the power station. Jacobsen Elektro also owns the 50-Megawatt Namanve Thermal Power Station in Mukono District, which they developed in 2008.

Construction costs

As of October 2014, the exact construction budget for the power plant and the high-tension power lines that will evacuate the generated electricity to where it will be integrated into the national grid is not publicly known. As a comparison, Kanungu Power Station with capacity of 6.6 megawatts (8,900 hp), was developed by a different company between 2008 and 2011 at a total cost of US$14 million. Kanungu Power Station in the town of Kanungu, lies about 13 kilometres (8.1 mi), by road, southwest of Nengo Bridge.

Construction time table

The power station is one of the nine renewable energy projects in Uganda that were awarded production licenses in October 2014 by the Electricity Regulatory Authority (ERA). Construction is expected to start in December 2014, and last approximately two years.