Neha Patil (Editor)

Mount Storm Wind Farm

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
United States

Type
  
Onshore

Construction began
  
2006

Status
  
Operational

Nameplate capacity
  
264 MW

Units operational
  
132

Mount Storm Wind Farm httpsuploadwikimediaorgwikipediacommonsthu

Location
  
Grant County, West Virginia

Similar
  
Shiloh Wind Power Pl, Klondike Wind Farm, Buffalo Gap Wind Farm, Twin Groves Wind Farm, Panther Creek Wind Farm

Mount storm wind farm in operation


The Mount Storm Wind Farm is located 120 miles west of Washington, D.C. in Grant County, West Virginia. The wind farm includes 132 Gamesa G80 wind turbines each with a two megawatt (MW) capacity along 12 miles of the Allegheny Front. Construction of the wind farm began in 2006 and the project is now fully operational, generating up to 264 MW of electricity for the mid-Atlantic power grid.

Contents

Nedpower Mount Storm, LLC is a joint venture between Shell and Dominion Resources, founded in 2007.

HistoryEdit

Plans for the farm were first announced in 2001, when U.S. Wind Force filed for a permit with the West Virginia Public Service Commission to build a 166 turbine wind farm, which would have been the largest wind farm east of the Mississippi River. The project's backers hoped that the first turbines would be operational by late 2002 with the rest of the facility coming online in 2003, but opponents quickly raised objections, arguing that the project would threaten birds and diminish home values in the surrounding area.

In May 2002, the Public Service Commission approved U.S. Wind Force's permit application without any significant opposition. The company also reached an agreement with the AFL-CIO to use union labor in the construction of the facility. At the hearings for the permit, speakers in favor of the project included Walt Helmick, a member of the West Virginia Senate, Jeff Barger, the County Commissioner of Grant County, and Steve White a union leader. A study by the U.S. Fish and Wildlife Service concluded that the project posed little danger to local birds, clearing the way for construction.

References

Mount Storm Wind Farm Wikipedia