Kalpana Kalpana (Editor)

Mount Baker Tunnel

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Built
  
1940

Opened
  
1940

Architectural style
  
Art Deco

NRHP Reference #
  
82004243

Area
  
6,475 m²

Added to NRHP
  
16 July 1982

Mount Baker Tunnel httpsc1staticflickrcom325073884486207b841

Location
  
MPS
  
Historic Bridges/Tunnels in Washington State TR

Similar
  
Lacey V Murrow Memorial, Homer M Hadley Memorial, Aubrey Davis Park, Schmitz Park Bridge, North Queen Anne Driv

The Mount Baker Tunnel or Mount Baker Ridge Tunnel carries Interstate 90 under the Mount Baker neighborhood of Seattle, Washington. It is actually a group of three tunnels that carry eight lanes of freeway traffic, plus a separate path for bicycles and pedestrians. The two originals are twin tunnel bores completed in 1940 and rehabilitated in 1993. The newest tunnel was built north of the original tunnels and opened in June 1989. The tunnel has a double-decked roadway with the bicycle/pedestrian path above the traffic lanes.

Contents

Mount Baker Tunnel I90 new Mount Baker Tunnel

The entire tunnel is listed on the National Register of Historic Places (NRHP), ID #82004243. The east portals of the tunnel, with murals designed by artist James FitzGerald, along with the Lacey V. Murrow Bridge, are an official City of Seattle landmark.

Mount Baker Tunnel Mount Baker bike tunnel Seattle Pentax Kx gt SMC PentaxM Flickr

The official length is 1,440 feet (440 m), though the perceived length while driving is closer to a 1 kilometre (3,300 ft) because of a cut-and-cover "lid" between the western portal and the beginning of the actual tunnel under the Mount Baker ridge. The eastern end of the tunnel links to the I-90 floating bridge on Lake Washington.

Mount Baker Tunnel FileSeattle Mt Baker tunnel 02jpg Wikimedia Commons

At 63 feet (19 m) in diameter, it is the world's largest diameter soft earth tunnel, having been bored through clay.

Mount Baker Tunnel Bridgehuntercom I90 Mt Baker Ridge Tunnel

Original

Mount Baker Tunnel 7BigsHNTBtunnelaerialjpg

When completed in 1940, the twin tunnels connected the I-90 floating bridge on Lake Washington and Rainier Avenue South in Seattle. The bridge and tunnels were part of US Highway 10, which used surface streets between the tunnels and downtown Seattle. US 10 was a four-lane, undivided highway. Each tunnel held two traffic lanes. The north tunnel normally carried two westbound lanes. The south tunnel normally carried two eastbound lanes. In the 1960s, a lane-use signal system was added to improve peak commute traffic. During peak commute times, the signals were used to make the center two lanes reversible. In the mornings, three lanes flowed west and one lane flowed east. In the evenings, three lanes flowed east and one lane flowed west. During morning and evening commutes, one tunnel carried two lanes of traffic in the same direction while the other tunnel carried opposing traffic separated by only dashed yellow lines.

Mount Baker Tunnel I90 Mount Baker tunnels

The highway would later become part of Interstate 90, be expanded, and upgraded to a controlled-access freeway. The freeway expansion and upgrade was completed in 1993.

Current

Upon completion of the I-90 expansion, the freeway capacity increased to three general-purpose lanes in each direction and two reversible HOV lanes. Eastbound traffic uses the original tunnels. Westbound traffic uses the upper deck of the northern new tunnel. A two-lane reversible roadway uses the lower deck. The reversible roadway serves as express lanes for transit buses and carpools (2+ people) during peak commute periods. The express lanes flow westbound on weekday mornings and eastbound on weekday afternoons and evenings. On weekends, the express lanes are open; traffic direction is variable depending on anticipated traffic volumes. When the express lanes are open to eastbound traffic, single-occupant vehicles headed to Mercer Island are allowed to use the lanes.

Future use

The Washington State Department of Transportation is renovating I-90 between Interstate 5 and the East Channel Bridge to add one HOV lane in each direction. WSDOT is also modifying the Bellevue Way exit and entrance ramps. On Mercer Island, WSDOT and Sound Transit are building direct access ramps to allow buses and HOVs to exit and enter I-90 from the future HOV lanes. When the HOV lanes and direct access ramps are complete, the express lanes will be dedicated to Eastside Link light rail use.

Sound Transit will soon begin to build light rail rapid transit in the current I-90 Express Lanes for the East Link light rail line connecting Seattle with the Bellevue and Redmond suburbs. Voters in urban and suburban King, Pierce, and Snohomish counties rejected the measure on November 6, 2007, as part of an $18 billion "Roads and Transit" construction package, but approved the plan a year later as part of a transit-only initiative.

References

Mount Baker Tunnel Wikipedia