Samiksha Jaiswal (Editor)

Moroto–Nakapiripirit Road

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
North end:
  
Moroto

Length
  
93.3 km

South end:
  
Nakapiripirit

Moroto–Nakapiripirit Road

History:
  
Designated in 2013 Expected completion in 2016

Major cities
  
Moroto Town, Nakapiripirit

Moroto–Nakapiripirit Road is a road in the Northern Region of Uganda. The road connects the towns of Moroto, the largest town in the Karamoja sub-region, and Nakapiripirit in the same sub-region.

Contents

Location

The road starts at Moroto and continues south through Lorengedwat, ending in Nakapiripirit, a distance of approximately 98 kilometres (61 mi). Nakapiripirit lies on the way to Mbale, the nearest large town, approximately 161 kilometres (100 mi) south of Nakapiripirit. The coordinates of the road near Lorengedwat are 2°20'48.0"N, 34°35'27.0"E (Latitude:2.346667; Longitude:34.5908331).

Upgrading to bitumen

Beginning with the 2011/2012 national budget, road became one of those planned to be upgraded from gravel to bituminous surface. With political pressure from the Karamoja parliamentary caucus, the road was prioritized in the 2013/2014 financial year. On 12 November 2013, President Yoweri Museveni commissioned the start of construction. The China Road and Bridge Construction Corporation, a subsidiary of the China Communications Construction Company, was awarded the contract for the 93.3 kilometres (58 mi) road at a cost of US$80 million (USh:184 billion at that time), fully funded by the Ugandan government. The road is expected to be ready during the first half of 2016.

References

Moroto–Nakapiripirit Road Wikipedia