Kalpana Kalpana (Editor)

Milan–Genoa railway

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
0.000
  
Milano Centrale

9.567 0.000
  
Milano Rogoredo

13.207
  
Villamaggiore

3.779
  
Milano Lambrate

8.208
  
Locate Triulzi

Milan–Genoa railway

10.835
  
Pieve Emanuelesince 2013

The Genoa–Milan railway is a major Italian rail line, connecting the cities of Genoa and Milan. It is 157 km (98 mi) long and fully electrified at 3,000V DC. Passenger traffic is managed by Trenitalia.

Contents

History

Unlike the Turin-Genoa line, the Milan-Genoa line was not built as a single project. Instead it developed from the joining of different lines by a shortcut. The first part of the line from Milan to Genoa is the section from Milano Rogoredo to Pavia, which was opened on 10 May 1862 as a branch off the line from Milano Centrale to Piacenza, opened on 14 November 1861. Earlier, on 25 January 1858, the Alessandria-Tortona-Voghera-Casteggio line opened to the public along with the connection between Tortona and Novi Ligure, providing good connections to the by now completed Turin-Genoa line. On 14 November 1867 the opening to traffic of the rail link from Pavia to Voghera completed the link between Milan and Genoa.

The section between Genoa and Novi Ligure over the Giovi Pass used by both the Turin-Genoa and the Milan-Genoa lines, however, was extremely difficult and therefore a new link between Arquata Scrivia and Tortona was built which was opened on 1 October 1916, completing the current form of the line, except for improvements made in Genoa and the deviation opened in 2007 between Milan Rogoredo and Locate Triulzi replacing the 1862 route.

High speed line

A project has been under development since 1991 for a high speed line between Genoa and Milan (also known as “third Giovi pass”). In 2006 the ‘’Interministerial Committee for Economic Planning’’ of the Italian Government approved the final draft of this proposal.

References

Milan–Genoa railway Wikipedia