Supriya Ghosh (Editor)

Metronit

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Native name
  
Hebrew: מטרונית‎‎

Transit type
  
Bus rapid transit

Number of stations
  
143

Locale
  
Haifa and the Krayot

Number of lines
  
3

Daily ridership
  
92,000 (May 2015)

Metronit

The Metronit (Hebrew: מטרונית‎‎), also spelled Matronit, is a bus rapid transit system in Haifa, Israel.

Contents

Name

The name, Metronit, was among some 500 suggestions submitted by the public in a prize-winning competition. Metronit was chosen for several reasons. The name itself was deemed to be easily expressed, catchy and unique. The Hebrew word, "Matronit" - meaning "respectable woman" or "lady" in Hebrew - was felt to convey a feeling of elegance and respectability. The prefix "Metro-" implies an efficient metropolitan rapid transportation system; the trailing "-it" is in line with Haifa's existing Carmelit funicular subway and the Shkhunatit internal neighbourhood minibus system.

Vehicles

The Metronit consists of 90 18.75-meter long high-capacity buses on three routes, with a capacity of 120-140 passengers per bus. Some of the buses operate with hybrid engines (six Phileas buses manufactured by APTS) and are currently being evaluated for more widespread use. The rest of the buses are conventional MAN Lion's City GL Diesel powered buses. The network is a total of 60 km (37 mi) in length - of which 40 km (25 mi) are dedicated roadways.

The Metronit is unique in Israel in that it uses bi-articulated buses on specific routes. The choice of this mode of transport was due to the advantage of limited damage to the environment during construction, increased capacity on existing roads, and reduced operating costs compared to a standard bus or light rail line.

Construction

The Metronit project was developed by Yefe Nof, a company owned by the City of Haifa which is involved in planning public transportation, infrastructure, and other building projects in the Haifa metropolitan area. A tender for its operation was published in September 2009 with the original intention that the system be completed by Fall 2012. On August 4, 2010, it was announced that Dan won the tender to operate the system for 12 years. The cost of the system is estimated at 1.5 billion NIS (approximately $400 million US).

Commencement of operations

The Metronit began testing on August 2, 2013, and passenger operations commenced on August 16, 2013. As the first BRT system in Israel, there were initially many operational problems, caused mainly by a lack of priority at traffic lights, insufficient bus drivers and more passengers than anticipated. To promote the service, there was initially a period of free ridership that ended on December 23, 2013.

In May 2015, the daily ridership on the Metronit was 92,000 - with a total of 30 million passengers using the system in the first year.

Lines

There are currently three Metronit lines. The first operates from the Krayot Central Bus Station to Hof HaCarmel, the second from Kiryat Ata to Bat Galim Central, and the third from Kiryat Yam to Hadar HaCarmel.

References

Metronit Wikipedia