Operator(s)
  
War Department

Depot(s)
  
Melbourne

Melbourne line httpsuploadwikimediaorgwikipediaenthumbc

Locale
  
Derbyshire, Leicestershire

Stations
  
Worthington, Tonge and Breedon, Melbourne

Opened
  
1868 (Derby Midland – Melbourne), 1874 (Melbourne – Ashby-de-la-Zouch), 1939 (as military railway)

Closed
  
1945 (as military railway), 1980 (as civilian railway)

Owner
  
London, Midland and Scottish Railway (during military use)

The Melbourne Line was a railway line which ran from Derby to Ashby de la Zouch. It was used by the British Army and Allied engineers during the Second World War from 1939 until late 1944 to prepare them for the invasion of mainland Europe. Engineers practised the demolition and rebuilding of railways and the running and maintenance of a railway line and its rolling stock. There was also a bridge building school at Kings Newton.

Contents

Location

The section used by the military was between junctions near Ashby-de-la-Zouch in Leicestershire and Chellaston and Swarkestone in Derbyshire. Its principal station was Melbourne, which was actually at the hamlet of Kings Newton. Troops camped mainly at Weston-on-Trent from 1940. A suspension bridge linked the camp with Kings Newton over the Trent.

Background

In the early stages of the War it was soon realised that the military railway at Longmoor would have to be expanded if the capacity to train the necessary railway personnel was to be met.

A second training establishment was sought. Derby Midland was a major railway centre. The London, Midland and Scottish Railway staff college there was about to close and its Principal, Colonel Lionel Manton recommended the nearby rural freight line between Derby and Ashby de la Zouch be used as a training line. On 19 November 1939 the section of the line from Chellaston East Junction to the Smisby Road crossing, just north of Ashby, was handed over to the War Department. It was named the No. 2 Railway Training Centre (No. 1 being at Longmoor).

The line was named the Melbourne Military Railway after its principal station. Immediately south of Chellaston East Junction the railway established its headquarters, consisting of workshops, offices, and engine sheds for eight locomotives. After the war this area became a wagon repair depot. At Kings Newton miles of sidings were built.

Initially the railway was to be used for individual training but later it was used for training complete railway operating companies who would work the line for a week at a time. Two such companies were Canadian. From July 1941 the Melbourne training regime was linked with that at Longmoor. Basic training took place in Hampshire before transfer to Melbourne where railway engineers undertook eight weeks training and construction engineers undertook 16 weeks training, which included eight weeks at the Kings Newton bridge building school. By the end of 1944 the additional facilities were no longer needed and the line was ready to hand back to the LMS.

On 11 July 1940 nine Royal Engineer sappers training on the railway were killed by a German bomb dropped on their billet in Church Street, Melbourne. Eight of them are buried in Melbourne Cemetery.

Operations

Major traffic on the line consisted of moving military stores to and from Kings Newton and Tonge, coal from the New Lount Colliery and lime from Cloud Hill, Worthington.

Eight or more locomotives were in steam daily but most were in very poor condition. They used water mainly pumped from the River Trent.

Final years

The railway track was handed back to the LMS on 1 January 1945 who then submitted a bill of £25,265 to the War Department to restore the line but in 1954 the section through Ashby was closed. In 1958 steam power was replaced by diesel on many local lines and large numbers of redundant steam locomotives were stored at Chellaston quarry. In March 1966 British Railways closed Chellaston Quarry Signal Box and the sidings were lifted in 1967 when the line was returned to single track running. BR finally closed the line on 21 May 1980. In 1988 the track was lifted and the section between Chellaston East Junction and Worthington was converted into part of National Cycle Route 6.

Remains

There are several remains of the railway: buffer stops on the Isley Walton Road, pillars from bridge building in the Trent, the concrete bases of buildings, some derelict brick buildings and remains of engine sheds at Chellaston Quarry. Additionally, Ashby Tunnel still survives and the eastern portal is accessible from a cutting in Tunnel Wood, although the western portal and its approach cutting have been infilled.

Two locomotives and a coach that ran on the line are now owned by the Kent and East Sussex Railway.