Samiksha Jaiswal (Editor)

Marysville Power Plant

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
United States

Primary fuel
  
Coal

Cooling source
  
St. Clair River

Decommission date
  
2001

Status
  
Demolished

Type
  
Steam

Owner
  
DTE Electric Company

Units operational
  
7

Marysville Power Plant Panoramio Photo of Marysville Power Plant opened 1922 Feb 2015

Location
  
Marysville, St. Clair County, Michigan

Dte marysville power plant implosion nov 7 2015


The Marysville Power Plant, nicknamed the Mighty Marysville, was a Coal-Fired Power Plant in Marysville, Michigan on the shore of the St. Clair River. The plant was imploded on November 7, 2015, after the land was sold to a developer.

Contents

Marysville Power Plant Mighty Marysville39 power plant comes down after 93 yrs

Dte energy marysville power plant implosion nov 2015


History of the PropertyEdit

Marysville Power Plant Mighty Marysville Coal Power plant Detroit Edison Demolition

The power plant was built on land that formerly housed a lumber mill. The mill was erected in 1690 and is claimed to be the first European settlement in present-day St. Clair County. In 1817 legislator, judge, and businessman Zephaniah W. Bunce came to the area. He named it "Bunceville" and the creek that ran through it "Bunce Creek". Bunceville, along with other small settlements along the St. Clair River would be consolidated into the community of Marysville in the late 1800s. The Bunce household was demolished for construction of the Power Plant and the creek was re-routed underneath the property. A rock and plaque mark the location of the Bunce homestead on the Detroit Edison property.

History of the PlantEdit

Marysville Power Plant Mighty Marysville Coal Power plant Detroit Edison Demolition

Work on the plant began in 1914, as demand grew for electrical power north of Metro Detroit. The plant started generating electricity in 1922 with its first original two units. Two more units were added in 1926. During the mid 1940s, the "high side" was added to the power plant. The "high side" referred to higher pressure steam which could turn higher capacity 75MW generators. During this period nearly 300 people worked at the Power Plant. The plant also had a max capacity of 300MW when both the low and high sides were operational. Between 1988 and 1992 the plant was idled, and returned to service in 1992. For nearly the next ten years, the power plant would continue to run with the two "high side" units with a total of 150MW. In 2001 the plant was idled again. In 2012 the plant was officially decommissioned and the property was placed on the market.

Demolition and ImplosionEdit

Marysville Power Plant httpsuploadwikimediaorgwikipediacommonsthu

DTE Energy placed the property on the market in 2012 and held an auction to sell any remaining equipment of value inside the plant. The property was sold to Commercial Development Corporation 2013. Contractors began demolition shortly after, demolishing the plant's turbine hall and historic club house. On November 7, 2015, the remaining boiler house was imploded.

Plans for the site include a hotel, condos, and marina.

Marysville Power Plant Mighty Marysville Coal Power plant Detroit Edison Demolition

Marysville Power Plant DTE Energy Marysville Power Plant Dismantling 3152015 YouTube

References

Marysville Power Plant Wikipedia